Gowanda Water Department MONTHLY BOARD REPORT Gowanda- Processed 9,604,000 gallons for the month of April for a daily average of 320,100 gallons. 31 Ufpo. Processed 4 work orders. Clean up/board windows from storm. Spent a lot of time locating curb boxes for LSLI inventory. Replaced 8 broken curb boxes the LSLI found while doing inventory. They also discovered 3 small service line leaks on village side. Fixed 2 of the 3 so far. 96 unknown service lines were identified. Spent a day working/ cleaning valve boxes to prepare for MDA. Work with MDA engineers for a whole day to do roughness test by flowing numerous hydrants in the village and shutting off many valves to get the flow the way they wanted. Good success no dirty water complaints. Collins 1- Processed 1,581,000 gallons for a daily average of 52,700 gallons. 35 Ufpo. Processed 4 work orders. Freshen RT 62. Lots of locating for the LSLI inventory. They were able to remove 80 unknowns with their potholing efforts. Changed 4 broken curb boxes. Had a water main break on mill st. We used vac truck to excavate hole and got that fixed. Received chemicals. Looked at log jam in clear creek, its causing water to back up into building. Collins 3- Processed 735,688 gallons for a daily average of 24,522 Processed 1 work order. Replaced one curb box the LSLI inventory found broken. Locate curb boxes for them to vac. Receive chemicals. Investigated a possible leak. Not a leak.