Text · page 54 of 58
Read the whole document on one page (all 58 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
10:24 AM Gowanda Comm Development Fund 05/0726 Unpaid Bills Detail As of May 7, 2026 Memo Open Balance C&S Engineers Inc. EPA 1144016 TBrook Site Testing through 4/24/2026 12,037.50 Total C&S Engineers inc. , 12,037.50 12,037.50 Page 6 of 6