3.0  SUMMARY OF PROPOSED LOADING CONDITIONS

When calculating the electrical load of a development two variables are evaluated, the total
connected load and the diversified load. The total connected load of the proposed building
represents the amount of electricity being consumed when all devices within the building are
connected and drawing power at the same time. The total connected load scenario is the maximum
value and may not represent realistic conditions, therefore the diversified load should also be
analyzed. The diversified load is an estimate of the expected electric consumption during peak
hours.

The existing building is currently served from the 12.5kV line, however electric consumption for the
building has not been provided and cannot be estimated. As a conservative approach the capacity
evaluation will consider the total area of development as a new load and not as a net increase from
the existing load of the building. For the basis of this analysis, this estimated load will be the
diversified load which is the one used to determine potential electric system upgrades. The table
below summarizes the estimated load and the information considered to calculate these. Refer to
Appendix C for detailed calculations of the estimated loading.

  Table 2. Proposed Loads

  Parameters  Quantities

  New Building  50,100
  Total Interior
  Existing Building  25,703
  Gross Area (sq-ft)
  TOTAL  75,803
  Elevator  0
  EV Charging Units  5
  Estimated Load (kW)  1,199
  Estimated Load (MVA)  1.20

4.0  GRID CAPACITY EVALUATION

Based on the proposed diversified load, the new West Seneca project will increase the total peak
load of the existing circuit to 6.91MVA. This additional load will increase the peak percentage rating
of the existing conditions to 56.1%. Refer to Appendix D for detailed calculations.

Based on experience, if the total peak percentage of the circuit is less than 90% the development
can be serviced without any upgrades, this will be considered a GREEN condition. If the total peak
percentage of the circuit post development is between 90% and 100% minor upgrades may be
required, such as increasing conductor size, replacing equipment, increasing the size of service
transformers, etc. This will be considered a YELLOW condition. If the total peak percentage of the
circuit post development exceeds 100% then major infrastructure upgrades may be required, such
as a new circuit design or substation upgrades. This will be considered a RED condition.

The West Seneca project is in a GREEN condition, see chart below.

  -2-
  Utility Grid Capacity Evaluation
  GCE West Seneca
  LaBella Project No. 2243432

  Page 31 of 110