Village of East Aurora Water System Improvements  July 2026
SEQRA Part 3 Supporting Information

  measures throughout construction. Trenchless installation methods will be
  utilized where practicable to minimize disturbance to streams and wetlands.
  Where open-cut stream crossings are necessary, construction will be completed
  in accordance with applicable NYSDEC and USACE permit conditions to minimize
  sedimentation and downstream water quality impacts. The Village will obtain
  coverage under the NYSDEC SPDES General Permit for Stormwater Discharges
  from Construction Activity prior to construction.

  3.h.  The proposed action may cause soil erosion, or otherwise create a source of
  stormwater discharge that may lead to siltation or other degradation of
  receiving water bodies.

  See response to 3.d and 3.e., above.

  3.i.  The proposed action may affect the water quality of any water bodies within
  or downstream of the site of the proposed action.

  See response to 3.d. and 3.e., above.

  4.  Impacts on Groundwater

  4.h.  Other Impacts: Construction impacts to Principal Aquifer

  The project area overlies a mapped Principal Aquifer. The proposed project
  consists of replacement and rehabilitation of existing public water distribution
  infrastructure and does not include construction of new water supply wells,
  increased groundwater withdrawals, or wastewater discharges to groundwater.
  Although temporary excavation and construction activities have the potential to
  affect groundwater quality, standard construction practices, spill prevention
  measures, and erosion and sediment control practices will be implemented
  throughout construction. Coverage under the NYSDEC SPDES General Permit for
  Stormwater Discharges from Construction Activity will be obtained, and the
  project SWPPP will include measures to minimize the potential for groundwater
  contamination. Accordingly, the proposed action is not expected to result in
  significant adverse impacts to the principal aquifer.

  5.  Impacts on Flooding

  5.a.  The proposed action may result in development in a designated floodway.

  Portions of the proposed water main replacement along Sheafer Avenue, North
  Grove Street, Church Street, and East Fillmore Avenue cross the FEMA-mapped
  floodway associated with Tannery Brook. Additional portions of the project
  along Parkdale Avenue, Green Street, Maple Street, Hilliker Court, and Millard
  Fillmore Place are located within the mapped 100-year or 500-year floodplains.

  5