Village of East Aurora Water System Improvements July 2026 SEQRA Part 3 Supporting Information The proposed action is likely to have a small impact on the local flora and fauna. All efforts will be made to reduce or eliminate the impact by limiting clearing and following all Federal and State guidelines related to ecological impacts and review processes. The USFWS New York Field Office’s Information, Planning, and Consultation (IPaC) System was queried to determine whether any federally listed endangered, threatened, or candidate species are known to inhabit the project area. The USFWS IPaC System reported the northern long-eared bat (Myotis septentrionalis, endangered), the tricolored bat (Perimyotis subflavus, proposed endangered) and the monarch butterfly (Danaus plexippus, proposed threatened). A review of the NYSDEC Environmental Resource Mapper did not identify any additional state-listed species within the project area. A habitat assessment will be completed during final design to identify suitable habitat for these species and to evaluate the presence of other sensitive ecological resources within the project area. The proposed improvements will occur primarily within existing roadways, roadway rights-of-way, the existing booster pump station site, and existing water storage tank sites, thereby minimizing impacts to natural habitats. Tree clearing, where necessary, will be conducted during the winter season (November 1 through March 31) to avoid impacts to the northern long-eared bat and tricolored bat. Coordination with the USFWS and NYSDEC will be completed, as appropriate, to ensure compliance with applicable state and federal requirements and to avoid or minimize impacts to protected species and their habitats. 7.g. The proposed action may substantially interfere with nesting/breeding, foraging, or over-wintering habitat for the predominant species that occupy or use the project site. The project area consists primarily of existing roadways, roadway rights-of-way, and developed utility facilities. Predominant wildlife species that may occur within or adjacent to the project area include eastern cottontail, white-tailed deer, raccoon, gray squirrel, eastern chipmunk, striped skunk, white-footed mouse, deer mouse, American robin, and American crow. The proposed improvements are expected to occur primarily within previously disturbed areas and are not anticipated to substantially alter available habitat for these common species. Limited tree clearing may be required in select locations; if necessary, tree removal will be minimized to the extent practicable and completed in accordance with applicable seasonal restrictions and regulatory requirements. Because the project will largely be confined to existing developed corridors and disturbed areas, substantial interference with nesting, breeding, foraging, or overwintering habitat is not anticipated. 7