Text · page 62 of 104
Read the whole document on one page (all 104 pages, each with its own heading)
Item a. CAMCO GENERAL CONTRACTING INC. PROPOSED CHANGE ORDER 10994 Tinkham Road Phone: (585)547-3898 No. 4 Darien, New York 14040 Fax: (585)547-3855 TITLE: Window Infills DATE: 02/03/2026 PROJECT: HAMLIN TOILET ROOM ADDITION IN HAMLIN PARK TO: Attn: Matthew Fuller Barton & Loguidice, D.P.C. ORIG: Owner Request 11 Centre Park, Suite 203 SUBMITTED: Rochester, New York 14614 COMPLETED: Phone:(585) 325-7190 REQUIRED: DESCRIPTION The original contract drawings did not call for either of the two windows on the existing Rec Building to be removed and infilled. These windows would otherwise conflict with the new Men's Room. Rather than hold up masonry, CamCo performed said work while the crew was on site. Infilling these openings was considered necessary. Num Item Description Ref Qty Unit Unit Price Amount 1 024000 Demo Windows and Concrete ` 3.000 MH 90.00 270.00 Sills 2 042000 CMU Infill Masonry Materials 2.000 Each 40.00 80.00 3 042001 CMU Infill Masonry Labor 4.000 MH 90.00 360.00 4 099101 Painting Labor 2.000 MH 90.00 180.00 5 100000 CamCo OH&P (20%) 1.000 LS 178.00 178.00 Item Total: $1,068.00 Total: $0.00 Total: $1,068.00 APPROVAL By: By: Cameron P. Sitarek Date: 02/03/2026 Date: