Text · page 68 of 104
Read the whole document on one page (all 104 pages, each with its own heading)
Item e. CAMCO GENERAL CONTRACTING INC. PROPOSED CHANGE ORDER 10994 Tinkham Road Phone: (585)547-3898 No. 8 Darien, New York 14040 Fax: (585)547-3855 TITLE: Ducts for Ventilation Fans DATE: 05/26/2026 PROJECT: HAMLIN TOILET ROOM ADDITION IN HAMLIN PARK TO: Attn: Matthew Fuller Barton & Loguidice, D.P.C. ORIG: Owner Request 11 Centre Park, Suite 203 SUBMITTED: Rochester, New York 14614 COMPLETED: Phone:(585) 325-7190 REQUIRED: DESCRIPTION The Village has requested a proposal to install ducts for the two new ventilation fans and have them exhaust out the gable face of the new roof. Num Item Description Ref Qty Unit Unit Price Amount 1 230000 New Materials - Boot adaptors, 1.000 LS 500.00 500.00 round duct, screws, hangers, sealant, insulation, and vent kits 2 230000 Installation Labor 8.000 MH 90.00 720.00 4 100000 CamCo OH&P (20%) 1.000 LS 244.00 244.00 Item Total: $1,464.00 Total: $0.00 Total: $1,464.00 Exclusions: 1) Each fan to have a separate exhaust duct and vent APPROVAL By: By: Cameron P. Sitarek Date: 05/26/2026 Date: