(h) A site map/construction drawing(s) specifying the location(s), size(s) and lengtb(s) of each erosion and sediment control practice; (i) Dimensions, material specifications and installation details for a ll erosion and sediment control practices, including the siting and sizing of any temporary sediment basins; (j) Temporary practices that will be converted to permanent control measures; (k) Implementation schedule for staging temporary erosion and sediment control practices, including the timing of initial placement and duration that each practice should remain in place; (I) Maintenance schedule to ensure continuous and effective operation of the erosion and sediment control practice; (m) Name(s) of the receiving water(s); (n) Delineation ofSWPPP implementation responsibilities for each part of the site; (o) Description of structural practices designed to divert flows from exposed soils, store flows, or otherwise limit runoff and the discharge of pollutants from exposed areas of the site to the degree attainable; and (p) Any existing data that describes the stonnwater runoff at tile site. (2) Land development activities meeting Condition A, B or C below shall also include water quantity and water quality controls (postconstruction stormwater runoff controls) as set forth in § 285-808(3) of this chapter as applicable: (a) Condition A: Storm water runoff from land development activity discharging a pollu tant of concern to either an impaired water identified on the Department's 3 03(d) list of impaired waters or a total maximum daily load (TMDL) designated watershed for which pollutants in stormwater have been identified as a source of the impairment. (b) Condition B: Stormwater runoff from land development activity disturbing five or more acres. (c) Condition C: Stormwater runoff from land development activity disturbing between one acres and five acres of land during the course of the project, exclusive of the construction of single-family residences and construction activities at agricultural properties. (3) SWPPP requirements for Condition A, B or C (postconstruction stormwater runoff controls): (a) All information in§ 285-808(1) of this chapter; (b) Description of each postconstruction stormwater management practice; (c) Site map/construction drawing(s) showing the specific location(s) and size(s) of each postconstruction stonnwater management practice; (d) Hydrologic and hydraulic analysis for a ll structural components of the stonnwater management system for the applicable design storms; (c) Comparison of postdevclopment stormwater runoff conditions w ith predevelopment conditions; (f) Dimensions, material specifications and installation details for each postconstruction stormwater management practice; (g) Maintenance schedule to ensure continuous and effective operation of each postconstruction storm water management practice; (h) Maintenance easements to ensure access to all storm water management practices at the site for the purpose of inspection and repair. Easements shall be recorded on the plan and shall remain in effect with transfer of title to the property; 8 43