Enforcement Response Plan:  Appendix O (continued)
Construction General Permit

Enforcement Response Plan: Construction General Permit

Violation  Issue  Minimum Response

Failure to obtain coverage under the  i) One or more acres of disturbed area  i) Notice of Violation
Construction General Permit WITH appropriate
erosion & sediment control practices  ii) One or more acres of disturbed area - violation ii) Cease and Desist
  continued for 30 or more days after discovery

  iii) One or more acres of disturbed area - violation iii) Formal Enforcement/Fines
  continued for 60 or more days after discovery

Failure to obtain coverage under the  i) One up to five acres of disturbed area  i) Notice of Violation
Construction General Permit and WITHOUT or
MINIMAL erosion & sediment control practices  ii) One up to five acres of disturbed area - violation ii) Cease and Desist
  continued for 15 or more days, after discovery

  iii) One up to five acres of disturbed area -  iii) Formal Enforcement/Fines
  violation continued for 30 or more days after
  discovery

  iv) Five or more acres  iv) Cease and Desist

  v) Five or more acres - violation continued for 30 or v) Formal Enforcement/Fines
  more days after discovery

Has coverage under the Construction General  i) One up to five acres of disturbed area  i) Warning letter with schedule for
Permit and has significant violations of permit  correctve action(s) (NOV Optional)

  ii) Failure to correct deficiencies in accordance  ii) NOV and/or Stop Work Order
  with schedule: One up to five acres of disturbed
  area

  iii) Five or more acres  iii) NOV and/or Stop Work Order

Failure to meet significant permit requirements. i) Unsatisfactory compliance inspection  i) Warning letter with Inspection report
Including, but not limited to:  listing deficiencies and schedule for
  correctve action(s)
- lack of or a substantially inadequate SWPPP;  ii) Failure to correct deficiencies in accordance
  with schedule  ii) NOV and/or Stop Work Order
- failure to implement or maintain BMPs;
  iii) Duration of noncompliance is longer than 60
- failure to perform required inspections  days.  iii) Formal Enforcement/Fines

  67