D. MCM 4 - Construction Site Stormwater Runoff Control
The Village of East Aurora has a program to ensure construction sites subject to the NYSDEC
General Permit for Stormwater Discharges from Construction Activity (CGP) are effectively
controlled. This program is designed to prevent pollution from construction related activities, as well
as ensure for proper planning and installation of post-construction SMPs. The Village of East Aurora
Construction Site Stormwater Runoff Control Program is supported by Local law 11-2007 Village of
East Aurora, NY Stormwater Management (ecode360.com)

1. Applicable Construction Activities/Projects/Sites
a. The construction site stormwater runoff control program addresses stormwater runoff to the
MS4 from sites with construction activities that:
  i. Result in a total land disturbance of greater than or equal to one acre; or

  ii. Disturb less than one acre if part of a larger common plan of development or sale (even if
  additional development/phase is years away).

b. For construction activities where the Village of East Aurora is listed as the owner/operator on
the Notice of Intent for coverage under the CGP. The Village of East Aurora will ensure its own
compliance with the CGP. The additional requirements for Section 3: Construction Oversight;
Section 6: SWPPP Review; Section 7: Pre-Construction Meeting; Section 8: Construction Site
Inspection; and Section 9: Construction Close-Out below are not required.

2. Public Reporting of Construction Site Complaints
a. To report stormwater complaints related to construction in the Village of East Aurora contact:

  Contact: Elizabeth Cassidy
  Phone: 716-652-7591
  Email: [email protected]

b. The Village of East Aurora documents reports of construction site complaints with the following
information:
  i. Date of the report;

  ii. Location of the construction site;

  iii. Nature of complaint;

  iv. Follow up actions taken or needed; and

  v. Inspection outcomes and any enforcement taken.