Although not included as an appendix, this documentation is considered part of the Village of East
Aurora SWMP Plan. It is available for public review upon request; contact the Stormwater Program
Coordinator or Stormwater Management Officer listed on page 2 of this document www.east-
aurora.ny.us/government/public-works-department.

3. Construction Oversight Program
Within one (1) year of the EDC
The Village of East Aurora has a construction oversight program. It is important to note that the
program encompasses the entire municipality, within and beyond the MS4 regulated area.

a. Construction oversight procedures in the Village of East Aurora are as follows:

  i. The construction site stormwater control program applies to all construction sites that are
  subject to the NYSDEC General Permit for Stormwater Discharges from Construction Activity
  (GP-0-20-001);

  ii. As per the NYSDEC General Permit for Stormwater Discharges from Construction Activity
  (GP-0-20-001), construction activities that require a Stormwater Pollution Prevention Plan
  (SWPPP) are listed in Appendix E;

  iii. Procedures for submitting SWPPPs to the Village of East Aurora are as follows:

  a. For all land development activities subject to review and approval by the Planning
  Commission or Village Board of the Village of East Aurora under floodplain
  development permit or subdivision regulations, the applicant or developer shall be
  required to submit an SWPPP that complies with the requirements of the Village
  code chapter 220 to the Storm Water Management Officer. Village of East Aurora,
  NY Stormwater Management (ecode360.com)

  •
  b. For all land development activities not subject to review by the Planning
  Commission or Village Board of the Village of East Aurora, the applicant or
  developer shall be required to submit an SWPPP prepared in accordance with the
  standards contained in Village code chapter 220 to the Storm Water Management
  Officer.
iv. The Village of East Aurora reviews Stormwater Pollution Prevention Plans (SWPPPs)
for all CGP-regulated constructed projects for conformance with NYS standards (Detailed below in
Part 6: SWPPP Review);

  v. Prior to commencement of CGP-regulated construction activity, the Village of East Aurora
  requires a pre-construction meeting (Detailed below in Part 7: Pre-Construction Meeting);

  vi. The Village of East Aurora inspects CGP-regulated construction sites to ensure
  compliance with the conditions of the CGP and is authorized to escalate enforcement actions
  as is necessary by 11-2007 Village of East Aurora, NY Stormwater Management
  (ecode360.com) . (Detailed below in Part 8: Construction Site Inspections);

  vii. All CGP-regulated construction projects in the Village of East Aurora are subject to
  construction site close-out requirements in conformance with the CGP (Detailed below in