Part 9: Construction site close-out);

  viii. The Village of East Aurora follows an enforcement process that includes expectations
  for compliance for CGP-regulated construction sites that fail to comply with the conditions of
  the CGP and their SWPPP. See Appendix O for the Enforcement Response Plan. For
  information on enforcement actions pertaining to specific construction sites in the Village of
  East Aurora contact:

  Contact: Elizabeth Cassidy
  Phone: 716-652-7591
  Email: [email protected]

  ix. Although not included in this SWMP Plan, documentation of enforcement measures
  addressing non-compliance with the Construction General Permit (GP-0-20-001) is available
  upon request by contacting the Stormwater Program Coordinator or Stormwater
  Management Officer listed on page 2 of this document.

  x. Other procedures associated with the control of stormwater runoff from applicable
  construction activities.
  Not Applicable

b. The Village of East Aurora, in partnership with the Western NY Stormwater Coalition, has an
employee training program addressing its Construction Site Stormwater Runoff Control Program.
This training engages employees in a classroom setting, and as appropriate, a SWPPP compliance
inspection at a construction site.
  i) All new staff that are charged with conducting any construction oversight activities
  will receive training on procedures prior to doing so;

  ii) All existing staff, that are charged with conducting any construction oversight
  activities will receive training on procedures prior to doing so, and, once every five (5)
  years, thereafter; and

  iii) If the construction oversight procedures are updated, all staff will receive training
  on the updates prior to conducting construction oversight.

c. The names, titles, and contact information for the individuals who have received construction
oversight training are updated annually;

d. All individuals involved in construction activity in the Village of East Aurora (e.g., contractor,
subcontractor, qualified inspector, SWPPP reviewers) will be certified and maintain four (4) hours of
NYSDEC endorsed training in proper erosion and sediment control principles by attending the
NYSDEC 4-Hour Erosion and Sediment Control Training. This training is offered annually by Erie and
Niagara County Soil and Water Conservation Districts, as well as online by other Soil and Water
Conservation Districts across the state.