i) Individuals responsible for reviewing SWPPPs on behalf of the Village of East
  Aurora will maintain certification.

  ii) In conformance with the NYS CGP, contractors, subcontractors and qualified
  inspectors will maintain certification throughout the project. Contractors and and
  subcontractors will include a current copy of their NYS certification in the on-site
  SWPPP.

e. Annually, by April 1, the Village of East Aurora reviews and updates its construction oversight
procedures.

Compliance documentation is listed in Appendix B for:
  • Staff that have received construction oversight training;
  • Updates to the construction oversight procedures; and,
  • NYSDEC 4-Hour Erosion and Sediment Control Training for individuals involved in
  construction activity.

4. Construction Site Inventory & Inspection Tracking
Within six (6) months of the EDC
a. The Village of East Aurora maintains an inventory of CGP-regulated construction sites that
encompasses the entire municipality, within and beyond the MS4 regulated area. Although not
included as an appendix, the inventory is considered part of the Village of East Aurora SWMP Plan.
The inventory is available for public review and comment as follows:

  •  Upon request: contact Stormwater Program Coordinator or Stormwater Management
  Officer listed on page 2 of this document

  •  At the Village of East Aurora municipal building as follows:
  o Hardcopy: DPW
  o Electronically:
   Public: Upon Request
   Internally: C:\Users\Water Foreman\Documents\Storm Water\Construction
  Sites

The following information is included in the inventory:
  • Location of the construction site;
  • Owner/operator contact information, if other than the MS4 Operator;
  • Receiving waterbody name and class;
  • Receiving waterbody WI/PWL Segment ID;
  • Prioritization (high or low);
  • Construction project SPDES identification number;
  • SWPPP approval date;
  • Inspection history, including dates and ratings (satisfactory, marginal, or unsatisfactory,
  when available); and