Text · page 41 of 240
Read the whole document on one page (all 240 pages, each with its own heading)
• Current status of the construction site/project (i.e., active, temporarily shut down, complete). b. Annually, the Village of East Aurora updates the inventory if construction projects are approved or completed. 5. Construction Site Prioritization Within one (1) year a. The Village of East Aurora prioritizes all CGP-regulated construction sites which are included in the construction site inventory as follows: i. High priority construction sites include construction sites: a) With a direct conveyance (e.g., channel, ditch, storm sewer) to a surface water of the State: i) Classified as impaired by silt/sediment, phosphorus, or nitrogen as the Pollutant of Concern; ii) Classified as AA-S, AA, or A; or b) With greater than five (5) acres of disturbed earth at any one time; c) With earth disturbance within one hundred (100) feet of any lake or pond; and/or d) Within fifty (50) feet of any rivers or streams. ii. All other construction sites are considered low priority. b. All CGP-regulated construction sites are prioritized within thirty (30) days of becoming active; and c. Annually, after the initial prioritization, the Village of East Aurora updates the construction site prioritization in the inventory based on information gathered as part of the construction oversight. i. If the prioritization of the construction site changes priority based on information gathered as part of the construction oversight program, the MS4 Operator must comply with the requirements that apply to that prioritization. As noted above, the CGP-regulated construction sites inventory is available for public review and comment as follows: • Upon request: contact Stormwater Program Coordinator or Stormwater Management Officer listed on page 2 of this document • At the Village of East Aurora municipal building as follows: o Hardcopy: DPW