o Electronically:
   Public: Upon Request
   Internally: C:\Users\Water Foreman\Documents\Storm
  Water\Construction Sites

6. SWPPP Review
a. All individual(s) responsible for reviewing SWPPPs for acceptance will complete four (4) hours of
NYSDEC endorsed training in proper erosion and sediment control principles by attending the
NYSDEC 4-Hour Erosion and Sediment Control Training. This training is offered annually by Erie and
Niagara County Soil and Water Conservation Districts, as well as online by other Soil and Water
Conservation Districts across the state. This training will be completed within three (3) years of the
EDC and every three (3) years thereafter to maintain active certification.

b. SWPPP reviewers for the Village of East Aurora receive this training prior to
conducting SWPPP reviews for acceptance.
  i. Individuals without these trainings cannot review SWPPPs for acceptance.

  ii. Individuals who meet the definition of a qualified professional or qualified inspector are
  exempt from this requirement.

c. To ensure individuals responsible for reviewing SWPPPs review all SWPPPs for applicable
construction activities and for conformance with the requirements of the CGP, the NYSDEC SWPPP
Review Checklist will be utilized (Appendix F). SWPPP reviews will include the following:
  i. Erosion and sediment controls will be reviewed for conformance with the
  NYS Standards and Specifications for Erosion and Sediment Control 2016, or equivalent;

  ii. Individuals responsible for review of post-construction SMPs must be qualified
  professionals or under the supervision of a qualified professional; and

  iii. Post-construction SMPs must be reviewed for conformance with the NYS
  Stormwater Management Design Manual (NYS SWMDM) 2015 or equivalent, including:
  • All post-construction SMPs must meet the sizing criteria contained in the CGP and NYS
  SWMDM 2015.

  •  Deviations from the performance criteria of the NYS SWMDM 2015 must demonstrate
  that they are equivalent.

  •  The SWPPP must include an Operation & Maintenance Plan that includes inspection and
  maintenance schedules and actions to ensure continuous and effective operation of each
  post-construction SMP. The SWPPP must identify the entity that will be responsible for
  the long-term operation and maintenance of each practice.

Compliance documentation is listed in Appendix B for:
  • Staff involved in SWPPP reviews that have received NYSDEC 4-Hour Erosion and Sediment
  Control Training