Text · page 42 of 240
Read the whole document on one page (all 240 pages, each with its own heading)
o Electronically: Public: Upon Request Internally: C:\Users\Water Foreman\Documents\Storm Water\Construction Sites 6. SWPPP Review a. All individual(s) responsible for reviewing SWPPPs for acceptance will complete four (4) hours of NYSDEC endorsed training in proper erosion and sediment control principles by attending the NYSDEC 4-Hour Erosion and Sediment Control Training. This training is offered annually by Erie and Niagara County Soil and Water Conservation Districts, as well as online by other Soil and Water Conservation Districts across the state. This training will be completed within three (3) years of the EDC and every three (3) years thereafter to maintain active certification. b. SWPPP reviewers for the Village of East Aurora receive this training prior to conducting SWPPP reviews for acceptance. i. Individuals without these trainings cannot review SWPPPs for acceptance. ii. Individuals who meet the definition of a qualified professional or qualified inspector are exempt from this requirement. c. To ensure individuals responsible for reviewing SWPPPs review all SWPPPs for applicable construction activities and for conformance with the requirements of the CGP, the NYSDEC SWPPP Review Checklist will be utilized (Appendix F). SWPPP reviews will include the following: i. Erosion and sediment controls will be reviewed for conformance with the NYS Standards and Specifications for Erosion and Sediment Control 2016, or equivalent; ii. Individuals responsible for review of post-construction SMPs must be qualified professionals or under the supervision of a qualified professional; and iii. Post-construction SMPs must be reviewed for conformance with the NYS Stormwater Management Design Manual (NYS SWMDM) 2015 or equivalent, including: • All post-construction SMPs must meet the sizing criteria contained in the CGP and NYS SWMDM 2015. • Deviations from the performance criteria of the NYS SWMDM 2015 must demonstrate that they are equivalent. • The SWPPP must include an Operation & Maintenance Plan that includes inspection and maintenance schedules and actions to ensure continuous and effective operation of each post-construction SMP. The SWPPP must identify the entity that will be responsible for the long-term operation and maintenance of each practice. Compliance documentation is listed in Appendix B for: • Staff involved in SWPPP reviews that have received NYSDEC 4-Hour Erosion and Sediment Control Training