d. Although not included as an appendix, SWPPP reviews, as documented by the NYSDEC SWPPP Review Checklist, are considered part of the Village of East Aurora SWMP Plan. The SWPPP reviews are available for public review and comment as follows: • Upon request: contact Stormwater Program Coordinator or Stormwater Management Officer listed on page 2 this document • At the Village of East Aurora municipal building as follows: o Hardcopy: DPW o Electronically: • Public: Upon Request • Internally: C:\Users\Water Foreman\Documents\Storm Water\SWPP e. As new construction activities are added to the construction site inventory, they will be prioritized as noted previously; and f. The Village of East Aurora will notify construction site owner/operators that their SWPPP has been accepted using the MS4 SWPPP Acceptance Form created by the Department and required by the CGP, signed in accordance with Part X.J: Signatories and Certifications (MS4 General Permit: GP- 0-24-001). 7. Pre-Construction Meeting Prior to commencement of construction activities, the Village of East Aurora requires a pre- construction meeting. The date and content of the preconstruction inspection/meeting is documented in the construction site inventory of this SWMP Plan. The owner/operator listed on the CGP NOI, the Village of East Aurora, contractor(s) responsible for implementing the SWPPP for the construction activity, and the qualified inspector (if required for the construction activity) must attend the meeting in order to: a. Confirm the approved project has received, or will receive26, coverage under the CGP or an individual SPDES permit; b. Verify contractors and subcontractors selected by the owner/operator of the construction activity have identified at least one individual that has received four (4) hours of Department endorsed training in proper erosion and sediment control principles from a Soil & Water Conservation District or other endorsed entity as required by the CGP; and, a copy of the certification(s) for those individuals is added to the on-site SWPPP. c. Verify each of the contractors and subcontractors identified have signed a copy of the following certification statement below before they commence any construction activity: "I hereby certify under penalty of law that I understand and agree to comply with the terms and conditions of the SWPPP and agree to implement any