i.  All post-construction SMPs must meet the sizing criteria contained in the CGP and NYS
  SWMDM 2015.

  ii.  Deviations from the performance criteria of the NYS SWMDM 2015 must demonstrate
  that they are equivalent.

c. The SWPPP must include an O&M plan that includes inspection and maintenance schedules and
  actions to ensure continuous and effective operation of each post-construction SMP. The SWPPP
  must identify the entity that will be responsible for the long-term operation and maintenance of
  each practice.

4. Post-Construction SMP Inspection & Maintenance Program
Within one (1) year
The Village of East Aurora has an inspection and maintenance program for publicly
owned/operated and privately owned/operated post-construction SMPs.
a. The post-construction SMP inspection and maintenance procedures are as follows:
  i. All post-construction SMPs identified in the inventory are inspected at the frequency
  specified in the NYSDEC Maintenance Guidance 2017 or as specified in the O&M plan
  contained in the approved SWPPP, if available;

  ii.  The Post-Construction SMP Inspection Checklist in the NYSDEC Maintenance Guidance or
  an equivalent form containing the same information must be used to document post-
  construction SMP inspections. The Village of East Aurora will only accept Level 1
  inspections (NYS DEC Maintenance Guidance 2017) by private owners inspecting post-
  construction SMPs. Level 2 and Level 3 inspections must be performed by qualified
  individuals as indicated in the checklist document.

  The completed Post-Construction SMP Inspection Checklists are considered part of this
  SWMP Plan and are available as follows:
  • Upon request: contact Stormwater Program Coordinator or Stormwater
  Management Officer listed on page 2 of this document

  •  At the Village of East Aurora municipal building as follows:
  o Hardcopy: DPW
  o Electronically:
  • Public: Upon Request
  • Internally: C:\Users\Water Foreman\Documents\Storm
  Water\Post Construction Inspections

  iii. Upon receipt of a completed inspection checklist, the Village of East Aurora will inform
  the owner that follow-up actions indicated on the checklist (i.e. maintenance, repair, or
  higher level inspection) must occur within thirty (30) days of the post-construction SMP
  inspection; and