Text · page 48 of 240
Read the whole document on one page (all 240 pages, each with its own heading)
vi. Ownership; vii. Responsible party for maintenance; viii. Contact information for party responsible for maintenance; ix. Location of documentation depicting O&M requirements and legal agreements for post- construction SMP; x. Frequency for inspection of post-construction SMP, as specified in the New York State Department of Environmental Conservation Maintenance Guidance: Stormwater Management Practices, March 31, 2017 (NYS DEC Maintenance Guidance 2017) or as specified in the O&M plan contained in the approved SWPPP; xi. Reason for installation (e.g., new development, redevelopment, retrofit, flood control), if known; xii. Date of last inspection; xiii. Inspection results; and xiv. Any corrective actions identified and completed. d. Although the Village of East Aurora inventory of post-construction SMPs is considered part of this SWMP Plan and is available as follows: • Upon request: contact Stormwater Program Coordinator or Stormwater Management Officer listed on page 2 of this document • At the Village of East Aurora municipal building as follows: o Hardcopy: (Department Info) o Electronically: • Public: Upon Request •■Internally: C:\Users\Water Foreman\Documents\Storm Water\Post Construction Inventory 3. SWPPP Review As noted above, post-construction SMP SWPPP review requirements address the following: a. Individuals responsible for review of post-construction SMPs must be qualified professionals or under the supervision of a qualified professional; and b. Post-construction SMPs must be reviewed for conformance with the NYS Stormwater Management Design Manual (NYS SWMDM) 2015 or equivalent, including: