Text · page 4 of 5
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
WEST SENECA COMMUNITY CENTER Planning Board PROCEEDINGS 1300 Union Road Minutes #2026-01 West Seneca, NY 14224 January 8, 2026 parcels be merged into one singular parcel and limited to 29 units. Ayes: 7 Noes: 0 Abstain: 0 Motion Carried NEW BUSINESS SPR2025-006 A request of Green Philosophy 716 for property located at 101 Slade Ave. to permit a second sign. SPR 2025-006 a request from Green Philosophy 716, for property located at 101 Slade Avenue to permit a second sign. Ralph Lorigo, owner of the property, and Jacqueline Snyder, owner of Green Philosophy 716 stated that the zoning regulations only allow 1 sign per site. The proposed sign was displayed by the applicant. The request was approved for a second sign for Green Philosophy 716. The sign meets all the town requirements and is not offensive in nature. -Mr. Sherrman questioned if signs are prohibited from advertising marijuana sales. Ms. Snyder stated the signs are allowed but need approval and permission from the Office of Cannabis Management on the marketing and labeling requirements. No public comments were received. Motion by Chairperson Bebak, seconded by Planning Board Member Sherman, to approve the 2nd sign as presented. Ayes: 6 Noes: 1 Abstain: 0 Motion Carried SPR2025-007 A request of Fund Raising Barn LLC for property located at 1325 Orchard Park Rd. to allow the construction of a 1,200 SF addition to the existing business. A request from Fundraising Barn LLC for property located at 1325 Orchard Park Road, to allow the construction of a 1200 square foot addition to the existing business. James Bussart, owner of Bud’s Bottle Barn, 1325 Orchard Park Road, is looking to put an unheated 1200 square foot addition on the south side of the building. - Mrs. Bebak questioned if there’s residential to the rear and needs some sort of shielding. Mr. Scheiber stated there is sheilding there already. Mr. Scheiber stated some adjustments will need to be worked on if this project is approved, ensuring that the water is contained in this gentleman's property and doesn't spill over to anybody else. -Mr. Sherman questioned if a berm would be needed to contain the water issue. Mr. Frick verified a basin is between the 2 commercial properties, allowing the overflow to run through.