Town Board of the Town of Hamburg September 14, 2026 Meeting 4.35. Waterford Pines Phase 3 BE IT RESOLVED, that the Town Engineer’s report on the completion and acceptance of the WATERFORD PINES PHASE 3 street light installation work performed under Public Improvement Permit No. 1097 be received and accepted, and that the Supervisor is authorized to sign the report. BE IT FURTHER RESOLVED, that the Town Board authorize New York State Electric & Gas (NYSEG) to connect seven (7) 29 Watt, 2,920 Lumen LED post top luminaires in accordance with the existing rate tariff, and BE IT FURTHER RESOLVED, that two certified copies of this resolution be provided to the Engineering Department for transmittal to NYSEG, and that this resolution becomes effective on the day the report is signed by the Supervisor. 55