Text · page 7 of 106
e. Will the proposed action be constructed in multiple phases? 9 Yes 9 No i. If No, anticipated period of construction: months ii. If Yes: Total number of phases anticipated Anticipated commencement date of phase 1 (including demolition) month year Anticipated completion date of final phase month year Generally describe connections or relationships among phases, including any contingencies where progress of one phase may determine timing or duration of future phases: 9 9 f. Does the project include new residential uses? Yes No If Yes, show numbers of units proposed. One Family Two Family Three Family Multiple Family (four or more) 9 9 Initial Phase At completion of all phases 9 9 9 g. Does the proposed action include new non-residential construction (including expansions)? Yes No If Yes, i. Total number of structures ii. Dimensions (in feet) of largest proposed structure: height; width; and length iii. Approximate extent of building space to be heated or cooled: square feet h. Does the proposed action include construction or other activities that will result in the impoundment of any Yes No liquids, such as creation of a water supply, reservoir, pond, lake, waste lagoon or other storage? If Yes, i. Purpose of the impoundment: ii. If a water impoundment, the principal source of the water: Ground water Surface water streams 9 Other 9 specify: iii. If other than water, identify the type of impounded/contained liquids and their source. iv. Approximate size of the proposed impoundment. Volume: million gallons; surface area: acres v. Dimensions of the proposed dam or impounding structure: height; length vi. Construction method/materials for the proposed dam or impounding structure (e.g., earth fill, rock, wood, concrete): D.2. Project Operations a. Does the proposed action include any excavation, mining, or dredging, during construction, operations, or both? Yes No (Not including general site preparation, grading or installation of utilities or foundations where all excavated materials will remain onsite) If Yes: i .What is the purpose of the excavation or dredging? ii. How much material (including rock, earth, sediments, etc.) is proposed to be removed from the site? Volume (specify tons or cubic yards): 9 9 Over what duration of time? iii. Describe nature and characteristics of materials to be excavated or dredged, and plans to use, manage or dispose of them. iv. Will there be onsite dewatering or processing of excavated materials? Yes No If yes, describe. 9 9 v. What is the total area to be dredged or excavated? acres vi. What is the maximum area to be worked at any one time? acres vii. What would be the maximum depth of excavation or dredging? feet viii. Will the excavation require blasting? Yes No ix. Summarize site reclamation goals and plan: Page 4 of 15 FEAF 2026 7