Text · page 8 of 106
b. Would the proposed action cause or result in alteration of, increase or decrease in size of, or encroachment Yes No into any existing wetland, waterbody, shoreline, beach or adjacent area? If Yes: i. Identify the wetland or waterbody which would be affected (by name, water index number, wetland map number or geographic description): ii. Describe how the proposed action would affect that waterbody or wetland, e.g., excavation, fill, placement of structures, or alteration of channels, banks, and shorelines. Indicate extent of activities, alterations and additions in square feet or acres: iii. Will the proposed action cause or result in disturbance to bottom sediments? Yes No If Yes, describe: iv. Will the proposed action cause or result in the destruction or removal of aquatic vegetation? Yes No If Yes: acres of aquatic vegetation proposed to be removed:___________________________ expected acreage of aquatic vegetation remaining after project completion: purpose of proposed removal (e.g. beach clearing, invasive species control, boat access): proposed method of plant removal: if chemical/herbicide treatment will be used, specify product(s): v. Describe any proposed reclamation/mitigation following disturbance: c. Will the proposed action use, or create a new demand for water? Yes No If Yes: i. Total anticipated water usage/demand per day: gallons/day ii. Will the proposed action obtain water from an existing public water supply? Yes No If Yes: Name of district or service area: Does the existing public water supply have capacity to serve the proposal? Yes No Is the project site in the existing district? Yes No Is expansion of the district needed? Yes No Do existing lines serve the project site? Yes No iii. Will line extension within an existing district be necessary to supply the project? Yes No If Yes: Describe extensions or capacity expansions proposed to serve this project: Source(s) of supply for the district: iv. Is a new water supply district or service area proposed to be formed to serve the project site? Yes No If, Yes: Applicant/sponsor for new district: Date application submitted or anticipated: Proposed source(s) of supply for new district: v. If a public water supply will not be used, describe plans to provide water supply for the project: vi. If water supply will be from wells (public or private), what is the maximum pumping capacity: gallons/minute. Page 5 of 15 FEAF 2026 8