Town Board of the Town of Hamburg
August 10, 2026 Meeting
4.36. Mt. Vernon Manhole Repair and Joint Lining Project SEQR Resolution

WHEREAS, the Town of Hamburg has identified the need for manhole repairs and joint lining for the
Mount Vernon Sewer District, which consists of a sanitary sewer system that is currently owned,
operated, and maintained by the Town of Hamburg, but discharging to the Erie County Sewer District
No. 1; and

WHEREAS, this infrastructure work constitutes an eligible project pursuant to the Water Infrastructure
Improvement (WIIA) program and is therefore eligible for loan and grant assistance to help finance the
total project cost; and

WHEREAS, the Town of Hamburg intends to pursue grant assistance through the Environmental
Facilities Corporation (EFC) to undertake these improvements; and

WHEREAS, the application to EFC for grant assistance requires that the Town comply with the State
Environmental Quality Review Act (SEQRA) if applicable; and

WHEREAS, the project is considered to be “replacement, rehabilitation or reconstruction of a structure
or facility, in kind, on the same site” and is therefore a Type II action under Section 617.5c (2) of the
SEQR regulations; and

WHEREAS, the Town Board has reviewed the Project in accordance with the Town’s Local Waterfront
Revitalization Program and has completed a Waterfront Assessment Form (WAF) for a Coastal
Consistency determination and referred the Project to the LWRP committee, who recommended
consistency.

NOW, THEREFORE BE IT RESOLVED, the Hamburg Town Board has determined that funding and
implementing the project at the proposed location in the Mt. Vernon Sewer District is consistent with
the Town’s Local Waterfront Revitalization Program (“LWRP”), and will not result in any significant
adverse impacts on the environment.

BE IT FINALLY RESOLVED, the Hamburg Town Board herby determines that the manhole repairs
and joint lining improvements project is a Type II action under SEQR, and therefore the project is not
an action subject to further review under 6 NYCRR Part 617 of the SEQR regulations.

  157