  Project: Mt. Vernon Manhole Repair Project
  Date:
  7/16/26

  Short Environmental Assessment FormPart 3
  Determination of Significance
For every question in Part 2 that was answered “moderate to large impact may occur,” or if there is a need to explain why a
particular element of the proposed action may or will not result in a significant adverse environmental impact, please
complete Part 3. Part 3 should, in sufficient detail, identify the impact, including any measures or design elements that
have been included by the project sponsor to avoid or reduce impacts. Part 3 should also explain how the lead agency
determined that the impact may or will not be significant. Each potential impact should be assessed considering its setting,
probability of occurring, duration, irreversibility, geographic scope and magnitude. Also consider the potential for short-
term, long-term and cumulative impacts.

The proposed project involves manhole repairs and joint lining for the Mount Vernon Sewer
District, which consists of a sanitary sewer system that is currently owned, operated, and
maintained by the Town of Hamburg, but discharging to the Erie County Sewer District No. 1.
The manhole rehabilitation and joint lining will involve trench-less rehabilitation, including lining
the inside of the manhole, patching leaks, and installation of water barriers and/or chimney seals.
All appropriate permitting and approvals will be received prior to construction.

The proposed project is located in the Local Waterfront Revitalization Area of the Town's LWRP
and has been shown to be consistent with this plan.

The project has received a Letter of No Effect from the State Historic Preservation Office
(SHPO), signifying no significant environmental impacts to historic, cultural, or archaeological
resources are expected.

  Check this box if you have determined, based on the information and analysis above, and any supporting
  documentation,that the proposed action may result in one or more potentially large or significant adverse impacts
  and an environmental impact statement is required.
  Check this box if you have determined, based on the information and analysis above, and any supporting
 ✔  documentation,that the proposed action will not result in any significant adverse environmental impacts.

 Town of Hamburg  7/16/26
  Name of Lead Agency  Date
 Elizabeth Farrell-Lorentz  Supervisor
 Print or Type Name of Responsible Officer in Lead Agency  Title of Responsible Officer in Lead Agency

  Signature of Responsible Officer in Lead Agency  Signature of Preparer (if different from Responsible Officer)

  Page 2 of 2  SEAF 2026