Text · page 36 of 215
Read the whole document on one page (all 215 pages, each with its own heading)
(g) Maintenance and protection of traffic on Local streets shall be done in accordance with NYSDOT traffic safety regulations. (h) The contractor shall be responsible for the proper disconnection of all utilities. (i) All work shall be performed in accordance with New York State and Town of Hamburg, Village of Hamburg and Village of Blasdell Codes. (j) The demolition of the buildings shall be done as per NYCRR 56, Subpart 56- 11.5 ( controlled demolition).The Town of Hamburg will procure the necessary third party air monitoring services as required during the demolition. (k) The contractor shall provide adequate insurance coverage and obtain the necessary demolition permit. There will be no fee charged for the permit. Form of Proposal One copy of your quotation is to be submitted as follows: (1) The proposal is to represent the cost for all necessary work as deemed necessary to accomplish the demolition described in the scope of work. This cost should include the necessary costs (including but not limited to labor, equipment, tool, mobilization to the site and any other direct and indirect cost associated with the performance of the specified services). Bidders must provide an estimate of the cost involved with (a) The initial emergency demolition of a 2,000 square foot residential house that has been damaged by fire (b) The remaining demolition of the above structure to a seeded yard after the scene has been release by the investigators. (2) Provide a list of the equipment that is available to be mobilized and the time required to mobilize that the equipment. (3) Insurances (Liability and Workmen’s Compensation & Disability). Commercial Liability (Town of Hamburg must be named as additional insured) General Aggregate $1,000,000.00 Products and Comp/Op, Aggregate $2,000,000.00 Personal & Advertising Injury $1,000,000.00 Each Occurrence $1,000,000.00 36