Southtowns Record

Town Board Regular Meeting Agenda, Aug 10, 2026 — Agenda

Government
Town of Hamburg
Board
Town Board
Meeting
Aug 10, 2026
Kind
Agenda
Topics
Zoning and land use, Water, sewer and drainage, Public safety, Budget and taxes, Parks and recreation, Roads and traffic, Audits and oversight

Original document

Same meeting

Text · page 91 of 215

Read the whole document on one page (all 215 pages, each with its own heading)

C.3. Zoning

a. Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance.  9 Yes 9 No
  ✔
If Yes, what is the zoning classification(s) including any applicable overlay district?
ECC_________________________________________________________________________________________________________
  South Campus is currently zoned R3 (Multifamily), McKinley Mall is zoned C1 (Local Retail Business) with an overlay district (McKinley Mall Incentive
Zone), and the other affected parcels are zoned C3 (Office). Other parcels in corridor are C2.
  _________________________________________________________________________________________________________

b. Is the use permitted or allowed by a special or conditional use permit?  9 Yes 9 No
c. Is a zoning change requested as part of the proposed action?  9 Yes 9 No
If Yes,
  i. What is the proposed new zoning for the site? New
  ___________________________________________________________________
  SIA District, rezoning corridor to MU-1, modifications to McKinley Mall Incentive Zone

C.4. Existing community services.
a. In what school district is the project site located? Frontier
  ________________________________________________________________
  Central School District

 b. What police or other public protection forces serve the project site?
Town_________________________________________________________________________________________________________
  of Hamburg Police Department; Erie County Sherriff; New York State Police

c. Which fire protection and emergency medical services serve the project site?
  __________________________________________________________________________________________________________
Scranton Volunteer Fire Company; Mercy Hospital; Big Tree EMS

d. What parks serve the project site?
  __________________________________________________________________________________________________________
Orchard Acres Park near the existing McKinley Malld. The Stadium Economic Impact Area plan envisions significant public open spaces.
  __________________________________________________________________________________________________________

 D. Project Details

D.1. Proposed and Potential Development

a. What is the general nature of the proposed action (e.g., residential, industrial, commercial, recreational; if mixed, include all
  components)?
  _________________________________________________________________________________________________________
b. a. Total acreage of the site of the proposed action?  _____________ acres
  b. Total acreage to be physically disturbed?  _____________ acres
  c. Total acreage (project site and any contiguous properties) owned
  or controlled by the applicant or project sponsor?  _____________ acres

c. Is the proposed action an expansion of an existing project or use?  9 Yes 9 No
  i. If Yes, what is the approximate percentage of the proposed expansion and identify the units (e.g., acres, miles, housing units,
  square feet)? % ____________________  Units: ____________________
d. Is the proposed action a subdivision, or does it include a subdivision?  9 Yes 9 No
If Yes,
  i. Purpose or type of subdivision? (e.g., residential, industrial, commercial; if mixed, specify types)
  ________________________________________________________________________________________________________
  ii. Is a cluster/conservation layout proposed?  9 Yes 9 No
 iii. Number of lots proposed? ________
  iv. Minimum and maximum proposed lot sizes? Minimum __________ Maximum __________
e. Will the proposed action be constructed in multiple phases?  9 Yes 9 No
  i. If No, anticipated period of construction:  _____ months
 ii. If Yes:
  • Total number of phases anticipated  _____
  • Anticipated commencement date of phase 1 (including demolition)  _____ month _____ year
  • Anticipated completion date of final phase  _____ month _____year
  • Generally describe connections or relationships among phases, including any contingencies where progress of one phase may
  determine timing or duration of future phases: _______________________________________________________________
  ____________________________________________________________________________________________________
  ____________________________________________________________________________________________________

  Page 3 of 13

  91