  TOWN OF HAMBURG | ENGINEERING DESIGN SERVICES CO#1

SUBJECT: TOWN HALL PARKING LOT 2025 DESIGN SERVICES – CO#2

Dear Ms. Jarrell:
Thank you for the opportunity to continue working with the Town on this important project. During
our in-person meeting at the Town Hall on 4/14/2026, we visited the west face of the Police Station
and discussed adding to the project scope for Police Station pedestrian circulation. These
improvements to the Police Station were not previously included in the project scope of work and
therefore are captured in this Change Order #2. Per our in-person meeting on 4/14/2026 and
emails on 4/22/2026 and 4/23/2026, below please find the Additional Scope of Services,
Assumptions, and Fees for the Change Order #2 Design Services on the Town Hall Parking Lot
project.

A. SCOPE OF SERVICES

Task 1:  Detailed Design / Construction Documents (CD) (Completed, not included)
  Task 1 was included in our original contract. Task 1 has been completed, invoiced, and
  paid in full.

Task 2:  CO #1 Concept (Completed, not included)
  Task 2 was included in our Change Order #1 contract. Task 2 is complete.

Task 3:  CO #1 Construction Plans Revisions (not included)
  Task 3 was included in our Change Order #1 contract.

  Task 3.1: CO #1 Sidewalk Heating Plans (not included)
  Task 3.1 was included in our Change Order #1 contract.

  Task 3.2: CO #2 Police Station Revisions
  The following improvements will be added to the construction plans for the Police Station:
   Removal of unnecessary concrete ramp segment and handrail, while protecting
  the main public entrance ramp. The area where the ramp is removed will be
  paved at parking lot grade. ADA-compliant handrail will be added to fit the
  proposed condition. Open area below the ramp that is exposed by removal of the
  concrete ramp segment will be enclosed with CMU and grout.
   Removal of concrete sidewalk where the communications box is located. The
  communications box and adjacent downspout will be protected during
  construction. The area where sidewalk is removed will be replaced with grass
  area. The bottoms of the ramps on either side of this area will be cordoned off via
  installation of new ADA-compliant handrails. Bollards to further protect the
  communications box will not be required since the proposed pole-mounted ADA
  parking signs will obstruct vehicles from driving too close to the box.