3 TOWN OF HAMBURG | ENGINEERING DESIGN SERVICES CO#1 Task 4: CO #1 NYSDOT Driveway Permitting (not included) Task 4 was included in our Change Order #1 contract. B. ASSUMPTIONS 1. Any and all work not specifically included in the above “scope of work” is excluded. 2. All assumptions and exclusions in the Original Contract apply to this change order. 3. Town of Hamburg Planning Board Site Plan Review and Approval is not required. 4. It is assumed that site disturbance will be less than one (1) acre therefore, SPDES General Permit coverage and a Stormwater Pollution Prevention Plan (SWPPP) will not be required. If SPDES coverage, SWPPP, and SWPPP Inspections become necessary, Wendel can provide as additional services. 5. It is assumed Change Order #2 will not require modification of the project Bid Book. 6. It is assumed Change Order #2 will not require modification to Mechanical and Electrical specifications. Civil specifications may be modified or added, as needed to match Change Order #2 scope. 7. It is assumed Change Order #2 does not include heating of additional sidewalks. 8. It is assumed a revised Opinion of Probable Cost is not required. 9. It is assumed all work will be performed outside of the NYS Department of Transportation (DOT) Right-of-Way. 10. Bidding, Construction Administration, Construction Inspection, and Construction Management Services are excluded. 11. Delivery of revised Construction Plans will be in electronic PDF format. Printing of hardcopies are excluded. 12. It is assumed that meetings with the contractor are not required. 25 wendelcompanies.com