(as needed), shall approve, approve with modification, or disapprove the site plan. The Planning Board Chair will sign the site plan once the Town Engineer has determined that the engineering plans are acceptable and authorize the chair to sign the plan. The signed site plan shall be kept in the Planning and Engineering department files. E. Approval of any site plan so deemed shall remain in effect for a period of not more than one year unless a successful application for a building permit (or any other necessary required permit for a site plan that does not require a building permit) has been made within that period. If the applicant cannot meet this expiration period, they can apply in writing to the Planning Department for a single six-month extension prior to expiration, that could be granted by the Planning Board. When an extension is received, the Planning Department shall add the request to the ‘Other Business’ portion of the next available Planning Board meeting for the Planning Board to approve or deny. F. Site plan applications that are tabled by the Planning Board for additional information, or at the request of the applicant, will remain as tabled items for up to ninety calendar days (six subsequent Planning Board meetings). If during this ninety-day period, no new information is received, or unless an extension is requested and approved, the application will be considered to be expired after this ninety-day period of inactivity. Prior to the expiration of the application, the applicant can request in writing to the Planning Department that the ninety-day period be extended for one additional ninety-day period. To begin the process again, within one hundred eighty days of the expiration, the applicant will need to resubmit the application with 50% of the required fee. After one hundred eighty days of the date of expiration of the application, a new application will be required with the full application fee. G. If a site plan has been approved with conditions, pre-construction related conditions must be met prior to issuing any permit to begin construction. Construction or post construction conditions must be ensured through the Town’s inspection process and confirmed to be met prior to any certificate of occupancy or operation permit is granted. § 280-310.1. Authority to require additional data. In addition to the required site plan and supporting data indicated in this Article, the Planning Board may request of an applicant or their agent additional supporting data or plans that the Planning Board deems necessary and pertinent to carry out its responsibility for site plan review as provided in this Article. § 280-311. Submission of site plan and supporting data. A. The applicant or their agent shall submit five (5) hard copies of the site plan application form, site plan, other required Town forms, a SEQR EAF (part 1), and an application fee (to be determined by the Town). An electronic copy of these materials must also be submitted. The copies of a site plan and supporting data are to be prepared by and bearing the official seal and signature of a licensed architect, landscape architect, civil engineer or land surveyor (permitted by law to do such). These materials will include the following information, presented in drawn form at a scale approved by the Town and accompanied by a written text: (1) Survey of the property showing existing topographic features, including contours, large trees, buildings, structures, streets, property lines, utility easements, rights-of-way and 11