§ 280-309. Pre-application and Sketch Plan Submittal Process.
  A. If desired, an applicant may submit an optional sketch plan application, including a form
  (available from the Planning Department and on the Town website) and the appropriate
  associated fee at least 14 calendar days prior to the next available Planning Board meeting.
  Applicants are also encouraged to schedule a coordination meeting with the Planning
  Department prior to submitting a sketch plan application.

  B. Although there are no specific material requirements for a sketch plan submittal, the
  applicant should supply as much information as possible to illustrate what they are
  proposing. A survey of the property and a sketch of what is proposed would be very
  important, and any other materials that could further outline the proposed project, including
  but not limited to: conceptual site plan and renderings, elevation drawings, aerial maps, etc...

  C. The purpose of sketch plan review is to assist the applicant with understanding any concerns
  of the Planning Board, application requirements, and interpretation of the type of project.

  D. The Planning Board will informally review the overall design and layout against the intent
  and requirements of this chapter and provide feedback to the applicant on potential issues or
  concerns that should be addressed or additional information that should be submitted, if the
  applicant proceeds to full site plan application. The applicant can decide as to whether to
  submit an amended sketch plan to the Planning Board for further review,make a formal site
  plan application, or decide not to proceed.

§ 280-310. Procedure for review and approval of a site plan application.
A.  Once it is determined that a full site plan process is needed (see previous sections), the
  applicant must decide if they want to move forward with their application. If an applicant
  wants to move forward, a complete site plan application, including any specific information
  that the Planning Board requested during the sketch plan step (if the applicant received sketch
  plan direction), must be submitted to the Planning Department at least 14 calendar days prior
  to the next available Planning Board meeting. If the Planning Department determines that the
  application meets the site plan requirements, the application will be placed on the next
  available Planning Board agenda.
B.  Prior to any formal approval of a site plan, and once the Planning Board determines that the
  application is acceptable for further consideration and action, the Planning Board shall hold
  a public hearing, which shall be advertised at least once in a newspaper of general circulation
  in the Town at least five business days before such hearing. The Town shall also notify all
  adjoining property owners by mail of the public hearing. As a part of the public hearing for
  the site plan, a sign-in sheet shall be provided for the purpose of inclusion in Planning Board
  meeting minutes.
C.  Prior to moving forward with any decisions on the site plan application, the Planning Board
  shall hold the required public hearing, complete SEQR, and meet the requirements of County
  and adjoining community referral, if required, for the action.
D.  The Planning Board shall review the application, site plan and supporting data and, at a
  regular meeting of the Planning Board, after completing the public hearing, determining that
  all requirements have been met, after completing any required referrals and the SEQR process