Town of Hamburg, NY § 280-307 § 280-309 § 280-308. Administrative review waiver. A. An administrative review waiver may be issued if a proposed project is minor in nature to the extent that a full site plan review before the Planning Board may not be necessary. An administrative review waiver requires the site to have previously approved existing structure(s) and use(s). If the modifications are deemed minor by the Administrative Review Waiver Committee, consisting of a representative of the Building Department, the Town Engineer, a representative of the Planning Department and the Planning Board Chair, an administrative review waiver may be issued upon payment of the required fee (as set by the fee schedule that is established by resolution of the Hamburg Town Board). A minimum of three (3) signatures from the Administrative Review Waiver Committee must be secured on the administrative review waiver application to approve an administrative review waiver. Should there be a tie vote from the Administrative Review Waiver Committee, the project will be required to come to the Planning Board for site plan review. Once the administrative review waiver is approved or the Planning Board has issued site plan approval if the waiver was not granted, then the applicant may apply for a building permit. Furthermore, the administrative review waiver may include conditions that must be met for the issuance of the building permit. B. In general, an administrative review waiver may be issued for a project that has met one or more following criteria as determined by the Administrative Review Waiver Committee: (1) Additions or detached accessory structures of less than 1,500 square feet or which represent less than 10% of the existing structure, whichever is less, where no variances are needed for construction. (2) A minor change in use that does not require additional parking. (3) Such other minor changes or similar uses as determined by the Administrative Review Waiver Committee. C. In certain cases, the preparation of a site plan application may be deemed necessary to meet the requirements of an administrative review waiver process. It may also be determined that the proposed project needs formal site plan approval from the Planning Board. D. Determinations and approval conditions for an administrative review waiver may only be appealed by the applicant by appearing before the Planning Board under a formal site plan application. Approval of any administrative review waiver shall remain in effect for a period of not more than one year, unless a successful application for a building permit has been made within that period. 1. Editor's Note: See Ch. 230, Subdivision Regulations. Downloaded from https://ecode360.com/HA0055 on 2024-11-11 9