Southtowns Record

Town Board Regular Meeting Agenda, Apr 27, 2026 — Agenda

Government
Town of Hamburg
Board
Town Board
Meeting
Apr 27, 2026
Kind
Agenda
Topics
Zoning and land use, Water, sewer and drainage, Budget and taxes, Parks and recreation, Public safety, Roads and traffic

Original document

Same meeting

Text · page 39 of 105

Read the whole document on one page (all 105 pages, each with its own heading)

Introduction/Background
  The Town of Hamburg Ice Arena is seeking proposals from qualified audio/AV
contractors to design, supply, install, and commission a brand-new facility wide audio system,
replacing the current aging equipment. The upgraded audio equipment must support sporting
events, skating sessions, announcements, emergency paging, music playback, private events, and
rentals. The Town of Hamburg Ice Arena is a year-round facility used in the winter for skating
and hockey and in warmer weather for summer camp and sport rentals. The main programs held
at the Ice Arena include Hamburg Hawks hockey, Hilbert College hockey, high school hockey,
Public Skate, Learn to Skate, Skate and Shoot, SABAH (organization for individuals with
disabilities), Summer Day Camp, organized sports rentals (lacrosse, etc.) and private rentals. The
Ice Arena needs a brand-new audio system in order to continue to service the community.

Project Objectives
  •  Removal and disposal of existing/outdated equipment and wiring.
  •  Install new audio system and necessary wiring which must
  o Deliver clear, reliable, even, and high-quality sound coverage throughout rink and
  lobby areas.
  o Provide sound quality for fluctuating crowd sizes for programs and events.
  o Include durable equipment suitable for cold, humid, and reverberant
  environments.

Scope of Work
  Vendors must tour the site prior to submitting a proposal and must provide a detailed
description of the scope of work they will complete. This description should include all required
equipment, labor, materials, programming, and time frame. The scope includes the following.
  1. Design
  • Create an audio system layout fair to the dimensions of the rink and lobby areas and
  specify the location and size of the speakers on the provided diagram.
  o Rink area dimensions: 240 feet by 221 feet
  o Lobby area dimensions: 131 feet by 18 feet.

  2. Removal and Disposal of Existing Audio Equipment
  • Safe removal and disposal of all existing and outdated audio system components and
  wiring.
  • Patching and repairing small penetrations created by removal.

  39