88
  N
  P. GALBO

  START OF 4' WIDE  LIMIT OF PROPOSED SIDEWALK -
  SIDEWALK TO AVOID FENCE  SOUTHERNMOST FAIRGROUNDS DRIVEWAY
  AND UTILITY POLES
  PROJECT MANAGER

  PROPOSED SIDEWALK
  MATCHLINE STA. MP XX+XX SEE DWG. NO. PL-01

  END OF 4' WIDE SIDEWALK
  TO AVOID FENCE AND
  UTILITY POLES
  CHECK P. GALBO

  MCKINLEY PARKWAY
  DRAFTING V. CONERS
R:\2024\20240463 Clark Street-McKinle\18. CADD\Trans\20240463_General Plan.dwg

  LEGEND
  CHECK P. GALBO

  4" CONCRETE
  APPROX. END OF  SIDEWALK
  CLARK/MCKINLEY SURVEY
  6" CONCRETE CURB
  RAMP WITH DWS

  CONCRETE REMOVAL &
  TURF RESTORATION
  NOTES:
  1. PROPOSED SIDEWALK IS DRAWN AS 5'-0" WIDE EXCEPT WHERE NOTED DUE TO  SIGNAL PULLBOX
  ANTICIPATED WIDTH CONSTRAINTS.
  DESIGN V. CONERS

  SIGNAL POLE WITH
  2. SURVEY FROM THE CLARK & MCKINLEY PROJECT ENDS APPROXIMATELY WHERE  MAST ARM
  INDICATED. PROPOSED SIDEWALK LAYOUT BEYOND THAT POINT IS APROXIMATED
  USING AERIAL IMAGRY OF EXISTING SITE FEATURES SUCH AS FENCING AND UTILITY  SIGNAL HEAD
  POLES. FIELD VERIFICATION WOULD BE NEEDED TO CONFIRM CONSTRUCTABILITY,
  PEDESTRIAN
  PARTICULARLY IN THE AREA OF UTILITY POLE NYSEG 819/41.  SIGNAL POLE
  AFFIX SEAL:  ALTERED BY:  3. LAYOUT ASSUMES GUY WIRE FOR UTILITY POLE NYSEG 819/41 IS EITHER NOT IN
  ON:  ON:  PEDESTRIAN
  CONFLICT WITH PROPOSED SIDEWALK OR IS ABLE TO BE RESET/RELOCATED.
  SIGNAL HEAD
  4. LAYOUT ASSUMES HIGHWAY BOUNDARY LINE CONTINUES ALONG THE SURVEYED
  JOB MANAGER K. KOSTOWNIAK

  OFFSET PAST THE END OF SURVEY.  CONTROLLER CABINET
9/17/2024 11:43:54 AM

  5. LAYOUT ASSUMES GRADING PAST THE END OF SURVEY IS FEASIBLE WITHOUT  0  5  10  20
  FEET  CONDUIT & CONDUCTOR
  MAJOR ADJUSTMENTS WITHIN HIGHWAY BOUNDARY.
Victoria Coners

  AS-BUILT REVISIONS  ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED  TOWN OF HAMBURG
  DESCRIPTION OF ALTERATIONS:
  INTERSECTION IMPROVEMENT PROJECT
  CLARK STREET AND MCKINLEY PARKWAY
  DRAWING NO. PL-03
  GENERAL PLAN
  SHEET NO.
  IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
  TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
  SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.