Text · page 16 of 36
Read the whole document on one page (all 36 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
c. Site placement of buildings, accessory structures, fences, parking lots, sidewalks, storage tanks, waste-disposal units, etc. The location and size of water and sewer lines and appurtenances. The location, size and design of all outdoor lighting facilities, public-address systems and outdoor signs, including those posted on buildings. f. Ageneral landscaping plan and planting schedule, including buffer zones and green space. g. An estimated project schedule and phasing plan (final site plan). h. A performance bond, if determined to be appropriate, with the amount, completion schedule, public improvements covered and inspection and bond approval. 6. Impact on stormwater pollution: a. Astormwater pollution prevention plan (SWPPP), if required for the proposed development under Chapter 96, Stormwater Management, of the Code, b. The recommendation of the Stormwater Management Officer to approve, approve with modifications, or disapprove the SWPPP pursuant to Chapter 96 of the Cade. 7. Other: any other information or materials with the Town Board, Planning Board, Town's Engineer, Highway Superintendent and/or Code Enforcement Officer deems reasonably necessary and/or appropriate to complete a meaningful site plan review in connection with the applicant’s proposed .improvemenis or development project. 95-5 Waiver of review process. The Town Board may waive the applicability of all or any portion of the site plan review process to a particular applicant or project if it determines that such review is not in the interest of public health, safety or general welfare or is inappropriate to a particular site plan or project, except that the requirements of §95-4B(6) of this chapter shall not be waived. a 95-6 Decision; notice and filing A. Prior to reaching a final decision on a site plan review application, the Code Enforcement Officer shall, if required, mail notice of such proposed action to the Erie County Department of Environment and Planning. B. The decision of the Town Board on any site plan application shall be filed in the office of the Town Clerk within five business days after such decision is rendered and a copy mailed to the applicant. 95-7 Effective date. This chapter shall take effect the 11'" day of January 1999.