Text · page 60 of 67
Read the whole document on one page (all 67 pages, each with its own heading)
Task 1.9 Construction, Construction Management and Site Inspection After receipt of all necessary permits, the Contractor or its construction subcontractor(s) may begin construction work according to the final design and construction documents – including any site remediation as necessary to remove contaminated soil. The Contractor shall provide, or cause to be provided, notification to the Department that construction work will begin a minimum of 30 days prior to any Notice to Proceed or otherwise start of construction activity. Once work has begun, the Contractor shall provide in writing a summary of work progress that includes any existing and/or anticipated delays affecting Project completion. These progress reports should be provided at an interval agreed to by the Department and Contractor. The Contractor and/or the Department may also verify progress and completion of the work through periodic site inspections and photo documentation provided at intervals agreed to by the Department and Contractor. At an appropriate time nearing Project completion, the Contractor shall invite the Department to a site visit and provide a punch list of any incomplete items with an estimated schedule for full Project completion. Products: 30-day notification of construction starting Work progress written summaries and identification and notification of any substantial problems and delays. Photo-documentation of in-progress work Project substantially complete/completion site visit and punch list of any incomplete items with estimated schedule for full Project completion Task 1.10 Completion of Project Following completion of the Project, the Contractor shall submit, or cause to be submitted, a statement that the work has been completed in accordance with the contract and subcontract(s), the final design and construction specifications, and all permit requirements. The completion statement must be prepared and/or certified by a licensed professional engineer, architect or landscape architect. Unless otherwise specified during Project initiation meeting, the Contractor shall submit, or cause to be submitted, a full set of as-built plans in digital format and certified by a licensed professional engineer, architect or landscape architect. When the Contractor is satisfied work is complete, it shall submit to the Department a Final Project Summary Report along with a copy of the completion statement, the certified as-built plans, and photo- documentation in the form of digital files of the site work completed with NY Forward funding. The Contractor shall not submit a final payment request to the Department, until the Department has received all Project work Products and concurs that all Project work is complete. Products: Statement of completion, certified by a licensed professional engineer, architect, or landscape architect. Digital version of certified as-built plans Final Project Summary Report (https://forms.office.com/g/Fs7t8jaANv) Photos of completed Project documenting State-funded work Contract Number: C1003337 Page 5 of 7, Attachment C - Work Plan