WNY-2500056.00_HydroCAD  extreme_precip_tables_output (29) 24-hr S1 25-yr Rainfall=3.85"
Prepared by Greenman-Pedersen, Inc  Printed 12/18/2025
HydroCAD® 10.20-7a s/n 04560 © 2025 HydroCAD Software Solutions LLC  Page 167

  Pond RCVR 3: RCVR 3
  Stage-Discharge

  Primary
  901.25
  901.2
  901.15
  901.1
  901.05
  901
  Elevation (feet)

  900.95
  900.9
  900.85
  900.8
  900.75
  900.7

  900.65
  900.6
  900.55
  900.5  RCVR 3 to RCVR 2

  0  0.05  0.1  0.15  0.2  0.25  0.3  0.35  0.4 0.45 0.5  0.55  0.6  0.65  0.7  0.75  0.8  0.85
  Discharge (cfs)