Maximum Demand
  Junction Table - Time: 0.00 hours

  Label  Elevation  Demand  Hydraulic Grade  Pressure
  (ft)  (gpm)  (ft)  (psi)
 EX HYD  901.91  0  1,089.53  81
 Flow Hydrant M16G41  903.50  0  1,089.53  80
 J-2  904.54  0  1,089.53  80
 J-3  903.24  0  1,089.53  81
 J-4  904.50  42  1,082.55  77
 Residual Hydrant M16G42  902.50  0  1,089.53  81

  Pipe Table - Time: 0.00 hours

  Label  Length (Scaled)  Diameter  Material  Hazen-Williams  Has User Defined  Length (User
  (ft)  (in)  C  Length?  Defined)
  (ft)
 P-2  160  20.0  Concrete  100.0  True  758
 P-3  277  20.0  Concrete  100.0  False  0
 P-4  14  6.0  Ductile Iron  100.0  False  0
 P-5  97  2.0  Copper  100.0  False  0
 P-100  60  8.0  Ductile Iron  130.0  True  1,300

  Reservoir Table - Time: 0.00 hours

 Label  Elevation  Flow (In net)  Flow (Out net)  Hydraulic Grade
  (ft)  (gpm)  (gpm)  (ft)
 R-1  1,089.60  -42  42  1,089.60

  WaterCAD
WNY-2500056.00_WaterCAD Model.wtg  Bentley Systems, Inc. Haestad Methods Solution Center  [10.03.01.08]
12/22/2025  27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA  Page 4 of 6