359 QUAKER ROAD - DENTAL OFFICE

DETERMINE PEAK INSTANTANEOUS WATER DEMAND TO BE USED IN SIZING THE PROPOSED WATER SERVICE TO THE DENTAL OFFICE
(Information based on 2025 Plumbing Code of NYS & 2025 Residential Code of NYS)
  Type and Number of Fixtures
  Private  Water  Service  Dental  Clothes
Location  Lavatory  Closet  Sink  Chair  Washer
Dental Chairs  7
Staff Lounge  1
Restroom  4  4
Laboratory  1
Sterilization  1
Laundry  1
Total Fixture Count by Type =  4  4  3  7  1
Water Demand, gpm/fixture type =  0.8  3  3  1.5  4
Water Demand, gpm =  3.2  12  9  10.5  4
Total Peak Water Demand, gpm =  38.7

Check Total Water Demand Based on Water Supply Fixture Unit Loads
Water Supply Fixture Unit Load (w.s.f.u.) =  0.7  2.2  1.4  2  1.4
WSUL for all Fixtures =  2.8  8.8  4.2  14  1.4  =  31.2 w.s.f.u.
Total Peak Water Demand, gpm =  24  (System with Predominantly Flush Tanks)
Total Peak Water Demand, gpm =  42  (System with Predominantly Flush Valves)

Total Peak Water Demand, gpm =  42  <--- Use This To Size The Proposed Water Service To The Dental Office Building

Note: Calculations are based on Concept Floor Plan, prepared by SUTTON ARCHITECTURE

BY:  J. SOBOL - GREENMAN-PEDERSEN, INC.
DATE:  12/22/2025