c. Site placement of buildings, accessory structures, fences, parking lots, sidewalks, storage tanks, waste-disposal units, etc. d. The location and size of water and sewer lines and appurtenances. The location, size and design of all outdoor lighting facilities, public-address systems and outdoor signs, including those posted on buildings. f. Ageneral landscaping plan and planting schedule, including buffer zones and green space. g. Anestimated project schedule and phasing plan (final site plan). h. A performance bond, if determined to be appropriate, with the amount, completion schedule, public improvements covered and inspection and bond approval. 6. Impact on stormwater pollution: a. Astormwater pollution prevention plan (SWPPP), if required for the the proposed development under Chapter 96, Stormwater Management, of Code. b. The recommendation of the Stormwater Management Officer to approve, approve with modifications, or disapprove the SWPPP pursuant to Chapter 96 of the Code. Board, 7. Other: any other information or materials with the Town Board, Planning deems Town’s Engineer, Highway Superintendent and/or Code Enforcement Officer plan review reasonably necessary and/or appropriate to complete a meaningful site project. in connection with the applicant’s proposed improvements or development ility of all or any portion of the 95-5 Waiver of review process. The Town Board may waive the applicab nes that such review is not in the site plan review process to a particular applicant or project if it determi to a particular site plan or project, interest of public health, safety or general welfare or is inappropriate be waived. except that the requirements of §95-4B(6) of this chapter shall not 95-6 Decision; notice and filing Code Enforcement A. Prior to reaching a final decision ona site plan review application, the County Department Officer shall, if required, mail notice of such proposed action to the Erie of Environment and Planning. filed in the office of the B. The decision of the Town Board on any site plan application shall be d and a copy mailed to the Town Clerk within five business days after such decision is rendere applicant. January 1999. 95-7 Effective date. This chapter shall take effect the 11" day of