Text · page 9 of 10
Read the whole document on one page (all 10 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
A description of all existing deed restrictions or covenants applying to the property. The identification and record of the application and approval status of all necessary state and county permits as part of the final stage of any applicant’s site plan review. 2. Impact of proposal on environs: a. Relationship to: i. Adjacent and nearby land uses, both public and private. ii. Existing and proposed traffic patterns. iii. Existing and projected water supply, sewage disposal and similar service capabilities iv. The community’s ability to provide adequate recreation, education and fire protection. Visual compatibility with surroundings. e290 5 Effect on air and water quality standards applicable to commercial site plans. Effect on energy consumption and conservation. Whether the designated lead agency deems the proposal to be significant pursuant to the State Environmental Quality Review Act, in which event a draft environmental impact statement, followed by an environmental impact statement, will be required and reviewed. 3. Natural features: a. Geological features, such as depth to bedrock and the locations of rock outcrops. . Topographical features, including a map showing existing contour intervals of no more than five feet. Two-foot contour intervals will be required if the topography is relatively flat. Areas of steep slopes should be delineated as necessary. Soil characteristics, such as load-bearing capacity and drainage capacity. Hydrologic features, which should include drainage and natural runoff patterns, flood zones, noted wetlands, vegetative cover and average depth to groundwater. 4. Existing development and infrastructure: a. The location and dimensions of major buildings and structures. b. The location and width of roads, private drive and paths, including site access. The location, size and flow direction of sewers, water supply lines, and culverts; all utilities to be identified. Other existing developments adjacent to the site, including setback and lot line dimensions. 5. Proposed development: a. The intended use of the completed project. b. A grading and drainage plan.