Text · page 8 of 10
Read the whole document on one page (all 10 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
criteria used by the for the applicant to understand the basis for such determination, the Twon Board and others in the determination of disapproval. package will be sent to K. Upon approval by the Town Board, a complete final site plan review be issued to the applicant if the Code Enforcement Officer after which a building permit will he, she, or it complies with all other applicable rules and regulations. or other individuals involved in L. All costs incurred by the Planning Board and/or Town Board ion with the review the site plan review for consultation fees or other expenses in connect discretion either procedure shall be charged to and paid by the applicant, in the Town’s before or after they are incurred. 95-4 Submission requirements. Board with a A. The site plan submittal checklist will assist in oroviding the Town’s Planning a final site plan to the basis for reaching a final decision regarding the recommendation of An applicant’s Town Board for approval, disapproval or approval with modifications. bear the official and proposed site plan and all supporting data will be submitted by and r or land surveyor. signature of a licensed architect, landscape architect, professional enginee to the extent deemed B. Sit plan components, as allowed or required by state law, which will, as part of an appropriate, be considered by the Town Board, Planning Board and others data, impact on the analysis of an applicant’s site plan will include the following: legal development, impact on environs, natural features, existing man-made features, proposed ter pollution stormwater pollution and other information or materials. If a stormwa chapter, such SWPPP prevention plan (SWPPP) is submitted pursuant to §95-4B(6) of this as part of an analysis of shall be considered by the Town Board, Planning Board and others approved unless they an applicant’s site plan, and the site plan and SWPPP shall not be Chapter 96, Stormwater comply with the performance and design criteria and standards in Management, of the Code. 1. Legal data and 4. The name, address, email and phone number of the applicant and authorization of the owner if different from the applicant; the name and the address of the owner(s) of record, if different from the applicant; preparin g the name, address, email and phone number of the person or firm site plan and any related maps or sketches. options, rights- b. Ownership intentions of the applicant others, such as future of-way etc. c. Current zoning classification of the property, including exact zoning boundary if in more than one district. including d. Property boundary lines plotted to scale by a licensed surveyor, distances, angles, North arrow, scale and date. and proposed e. The locations, widths, elevations, and names of existing adjacent streets.