Text · page 96 of 154
Read the whole document on one page (all 154 pages, each with its own heading)
96 Town of Aurora 4.2 Comprehensive Capital Improvements & Resiliency Planning Incorporate climate resilience standards in the capital facilities plan (i.e. culvert upgrades, drainage channels, public EV charger, etc.). 4.3 Support, Where Feasible, the Expansion of EV Infrastructure Install publicly available EV charging stations at libraries, parks, municipal parking lots, and offer incentives for commercial sites to add chargers. 4.4 Define Battery Storage in Local Code and Develop BESS Use Standards Add definitions for Battery Energy Storage Systems (Tier 1 and Tier 2) to the zoning code and develop siting, safety, setback, and screening requirements. Reference NYS Unified Solar & Storage Permit model. Prohibit battery storage in residential and conservation areas; encourage placement in the Industrial Innovation Zone. 4.5 Permit Battery Storage in Industrial Zones as an Accessory or Standalone Use Amend zoning to allow Tier 1 and 2 battery storage systems in the Industrial Innovation Zone. Coordinate permitting with utility and site readiness requirements. 4.6 Integrate Battery Storage into Emergency Preparedness and Resilience Plans Work with emergency responders to assess the use of BESS at critical facilities (e.g., Town Hall, Senior Center). Explore microgrid feasibility to serve key community hubs.