Southtowns Record

1196 BIG TREE-SEQR FORM

Government
Town of Aurora
Board
Town Board
Meeting
Mar 4, 2026
Kind
Other
Topics
Water, sewer and drainage, Budget and taxes, Zoning and land use, Parks and recreation

Original document

Same meeting

Text · page 3 of 4

14. Identify the typical habitat types that occur on, or are likely to be found on the project site. Check all that apply:
  □Shoreline □ Forest ✔ Agricultural/grasslands  ✔ Early mid-successional

  Wetland  □ Urban ✔ Suburban
15. Does the site of the proposed action contain any species of animal, or associated habitats, listed by the State or  NO  YES
  Federal government as threatened or endangered?
  ✔
16. Is the project site located in the 100-year flood plan?  NO  YES

  ✔
  NO  YES
17. Will the proposed action create storm water discharge, either from point or non-point sources?
If Yes,  ✔
  a.  Will storm water discharges flow to adjacent properties?  ✔
  b. Will storm water discharges be directed to established conveyance systems (runoff and storm drains)?  ✔
If Yes, briefly describe:
_____________________________________________________________________________________________
Following on-site storm detention, stormwater will ultimately flow into the NYSDOT storm system along the north side of NYS Rt 20A.
_____________________________________________________________________________________________

18. Does the proposed action include construction or other activities that would result in the impoundment of water  NO  YES
  or other liquids (e.g., retention pond, waste lagoon, dam)?
If Yes, explain the purpose and size of the impoundment:______________________________________________
  ✔
____________________________________________________________________________________________

_19. Has the site of the proposed action or an adjoining property been the location of an active or closed solid waste  NO  YES
  management facility?
 If Yes, describe: _______________________________________________________________________________
  ✔
_____________________________________________________________________________________________

20.Has the site of the proposed action or an adjoining property been the subject of remediation (ongoing or  NO  YES
completed) for hazardous waste?
If Yes, describe: _______________________________________________________________________________
  ✔
_____________________________________________________________________________________________

  I CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS TRUE AND ACCURATE TO THE BEST OF
  MY KNOWLEDGE

  Applicant/sponsor/name: ____________________________________________________
  Carner Development Group Inc.  __________________________
  Date: 2.18.2026
  _____________________

  Signature: _____________________________________________________Title:__________________________________
  President

  PRINT FORM  Page 3 of 3