Work Proposal Contractor: Fairway Contracting Project: CAC Parking Lot Extension Contract For: Parking Lost Extension Date: 7-31-26 Engineer:OP Engineering Fairway Contracting to expand a milling parking area at the Community Activity Center. Work to include the extersion of a 12" HDPE culvert pipe. Removal of soil on areas on the provided drawings. Install appoximately 8-12" of millings in the newley excavated areas and to used the remaining millings supplied by others to re-top existing parking area. Fairway to additional remove the existing trail gate. This work to conform to the informal bid document suppled by the Town of Orchard Park Engineering Total: $11,190.88 Accepted: Contractor: Fairway Contracting Owner: By: By: Date: : Date: Comments: Contractor to corridnate work with the Town of Orchard Park Engineering All work to be completed by 8/8/2026