Text · page 149 of 219
Read the whole document on one page (all 219 pages, each with its own heading)
126 OF 148 CITY OF LACKAWANNA • NY 2026 ZONING ORDINANCE | Chapter 300: Zoning (3) New and replacement 3. Residential structures (except coastal high sanitary sewage systems hazard areas). shall be designed to a. Elevation. The following standards apply minimize or eliminate to new and substantially improved infiltration of floodwaters. residential structures located in areas Sanitary sewer and storm of special flood hazard, in addition to drainage systems for the requirements in Subsections E(1) buildings that have openings (b), Subdivision proposals, and E(1)(c), below the base flood Encroachments, and Subsection E(2), elevation shall be provided Standards for all structures. with automatic backflow valves or other automatic i. Within Zones A1-A30, AE and AH and backflow devices that are also Zone A if base flood elevation installed in each discharge data are available, new construction line passing through a and substantial improvements shall building's exterior wall; and have the top of the lowest floor (including basement) elevated to or (4) On-site waste disposal above two feet above the base flood systems shall be located to elevation. avoid impairment to them or contamination from them ii. Within Zone A: [Amended 6-29-2021] during flooding. b. When no base flood elevation data are (D). Storage tanks. available, a base flood elevation shall be determined by either: (1) Underground tanks shall be anchored to prevent i. Obtain and reasonably use data flotation, collapse and lateral available from a federal, state, movement during conditions or other source plus two feet of of the base flood. freeboard; or (2) Aboveground tanks shall be: ii. Determine the base flood elevation in accordance with accepted hydrologic a. Anchored to prevent flotation, collapse or and hydraulic engineering practice, lateral movement during conditions of the plus two feet of freeboard. base flood; or b. Determinations shall be undertaken b. Installed at or above the base flood by a registered design professional elevation as shown on the Flood who shall document that the technical Insurance Rate Map enumerated in methods used reflect currently accepted Subsection C(2) plus two feet. engineering practice. Studies, analyses, and computations shall be submitted in sufficient detail to allow thorough review and approval.