Text · page 154 of 219
Read the whole document on one page (all 219 pages, each with its own heading)
PART 11 Permit and Site Plan Procedures;Enforcement and Penalties 131 OF 148 l. Roof sheathing. be confirmed using established procedures. Grade beams shall be i. Plywood, or other wood material, installed in both directions for all piles when used as roof sheathing, considered to carry the breakaway shall not be less than 15/32 inch in wall load. Knee braces are required thickness, and shall be of exterior for front row piles that support sheathing grade or equivalent. All breakaway walls. attaching devices for sheathing and roof coverings shall be galvanized ii. Use of breakaway wall strengths or be of other suitable corrosion- in excess of 20 pounds per square resistant material. foot shall not be permitted unless a registered professional engineer ii. All corners, gable ends, and roof or architect has developed or overhangs exceeding six inches shall reviewed the structural design be reinforced by the application and specifications for the building of waterproof industrial adhesive foundation and breakaway wall applied to all bearing surfaces of any components, and certifies that: plywood sheet used in the sheathing 1) the breakaway walls will fail of such corner, gable end, or roof under water loads less than those overhang. that would occur during the base iii. In addition, roofs should be sloped as flood; and 2) the elevated portion steeply as practicable to reduce uplift of the building and supporting pressures, and special care should be foundation system will not be used in securing ridges, hips, valleys, subject to collapse, displacement, eaves, vents, chimneys, and other or other structural damage due points of discontinuity in the roofing to the effects of wind and water surface. loads acting simultaneously on all m. Protection of openings. All exterior glass building components (structural panels, windows, and doors shall be and nonstructural). Water loading designed, detailed, and constructed to values used shall be those associated withstand loads due to the design wind with the base flood. Wind loading speed of 75 mph. Connections for these values shall be those required by the elements must be designed to transfer building code. safely the design loads to the supporting 5. Nonresidential structures (except structure. Panel widths of multiple panel coastal high hazard areas). The following sliding glass doors shall not exceed three standards apply to new and substantially feet. improved commercial, industrial and n. Breakaway wall design standards. other nonresidential structures located in areas of special flood hazard, in addition i. The breakaway wall shall have a to the requirements in Subsections E(1) design safe loading resistance of (b), Subdivision proposals, and E(1)(c), not less than 10 and not more than Encroachments, and Subsection E(2), 20 pounds per square foot, with the Standards for all structures. criterion that the safety of the overall structure at the point of wall failure