Southtowns Record

May 19, 2026 Minutes

Government
Town of Elma
Board
Planning Board
Meeting
May 19, 2026
Kind
Minutes
Topics
Zoning and land use, Public safety, Water, sewer and drainage

Original document

Same meeting

Motions and votes

Copied word for word from these minutes. Who moved and seconded, the tally and the roll call appear only where the minutes state them. Picked out automatically: the minutes themselves are the record. All votes for this government.

  1. Mr. Millard made a motion to give preliminary site plan approval; the motion was seconded by Mr. Waver. Yes-6 No-0 Motion Carried

    Carried · Moved by Mr. Millard, seconded by Mr. Waver

    Page 3 of the minutes, motion 2

1 routine motion (minutes, bills, agenda, adjournment…)
  1. Mr. Merkle motioned to approve the Minutes of the EPB Regular Meeting held on April 19, 2026. Mr. Cleary 2nd motion. Motion approved.

    Carried · Moved by Mr. Merkle

    Page 1 of the minutes, motion 1

Text · page 2 of 3

Read the whole document on one page (all 3 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

Town of Elma Planning Board Minutes (5/19/2026)
  Page 2

III.  Siteplan review for a 50’ x 80’ addition for Transit Auto Detail @ 2161 Transit Rd
  Applicant Al Hassan (Continued)

  Site & Building Details: Applicant to submit updated site plan with revised dimensions and layout and
  removal of roofless garage.
  Lighting: need lighting locations on the site plan and details of lighting specs
  Parking: Two-way traffic through both existing curb cuts. Need details of parking on site plan including
  dimensions and layout
  Drainage: Engineering drainage/elevations not yet prepared; need to show stormwater direction and
  management. SEQR indicates no wetlands; town to verify against updated map. Need approval from town
  engineer
  Signage: Future building-mounted sign contemplated; no freestanding sign proposed for the addition at
  this time. Apply to Building Department for sign permit when ready.
  Landscaping: Need dumpster location with required screening on plan; Need details of fence
  type/height/location (likely 8 ft solid metal for impound) and landscaping depiction. The applicant plans
  to leave some woods on both sides as a buffer.
  Water Service & Septic System: Water service needed for new building; no new bathrooms in addition;
  existing septic remains for front building (three bathrooms). Need letter from Elma Water Department.
  Fire Department: Fire department access to new building not yet reviewed. Nearest hydrants identified
  along Transit (corner at Seneca & Transit). Needs approval letter from fire department.

IV.  Site plan review for an addition and pavilion to Crossroads Christian Church @ 1050
  Girdle Rd  Applicant Pat Kleitz

  The applicant presented a revised site plan for the Crossroads Church expansion, which received
  preliminary approval on 2026-03-17. Key changes include reducing the size of the initial addition
  (narthex/entry area) and building only the multipurpose room for now. The new auditorium and lobby
  expansion are designated as future phases. A new pavilion (an open, pole-barn style structure) is also part
  of the current plan. The septic system design is being managed by Metzger Engineering, who will explore
  expanding the existing system as suggested by the county. Parking has been reconfigured, reducing new
  pavement. The property ownership is changing, with a parcel being separated and deeded to “Father’s
  Heart,” a nonprofit, to create one contiguous parcel. The plan has undergone significant changes, requiring
  a restart of the review process.

  The checklist:
  Site & Building Details: Need dimensions for the new buildings on the site plan
  Lighting: Need detailed lighting plans for building exteriors and the sign. The applicant confirmed that
  new lighting will be limited to downlights under an entry canopy and on a sign.
  Parking: Were changes to the parking from the original plan. No new traffic patterns or curb cuts.
  Drainage: Need engineer report. Town engineer gave a verbal ok to the plan. Need a SWPPP.
  Signage: Will be a lite cross on the front of the building. Need lighting details
  Landscaping: Need a definite location and screening/enclosure plan for the dumpster. The only
  landscaping will be grass.