Town of Elma Planning Board Minutes (5/19/2026) Page 2 III. Siteplan review for a 50’ x 80’ addition for Transit Auto Detail @ 2161 Transit Rd Applicant Al Hassan (Continued) Site & Building Details: Applicant to submit updated site plan with revised dimensions and layout and removal of roofless garage. Lighting: need lighting locations on the site plan and details of lighting specs Parking: Two-way traffic through both existing curb cuts. Need details of parking on site plan including dimensions and layout Drainage: Engineering drainage/elevations not yet prepared; need to show stormwater direction and management. SEQR indicates no wetlands; town to verify against updated map. Need approval from town engineer Signage: Future building-mounted sign contemplated; no freestanding sign proposed for the addition at this time. Apply to Building Department for sign permit when ready. Landscaping: Need dumpster location with required screening on plan; Need details of fence type/height/location (likely 8 ft solid metal for impound) and landscaping depiction. The applicant plans to leave some woods on both sides as a buffer. Water Service & Septic System: Water service needed for new building; no new bathrooms in addition; existing septic remains for front building (three bathrooms). Need letter from Elma Water Department. Fire Department: Fire department access to new building not yet reviewed. Nearest hydrants identified along Transit (corner at Seneca & Transit). Needs approval letter from fire department. IV. Site plan review for an addition and pavilion to Crossroads Christian Church @ 1050 Girdle Rd Applicant Pat Kleitz The applicant presented a revised site plan for the Crossroads Church expansion, which received preliminary approval on 2026-03-17. Key changes include reducing the size of the initial addition (narthex/entry area) and building only the multipurpose room for now. The new auditorium and lobby expansion are designated as future phases. A new pavilion (an open, pole-barn style structure) is also part of the current plan. The septic system design is being managed by Metzger Engineering, who will explore expanding the existing system as suggested by the county. Parking has been reconfigured, reducing new pavement. The property ownership is changing, with a parcel being separated and deeded to “Father’s Heart,” a nonprofit, to create one contiguous parcel. The plan has undergone significant changes, requiring a restart of the review process. The checklist: Site & Building Details: Need dimensions for the new buildings on the site plan Lighting: Need detailed lighting plans for building exteriors and the sign. The applicant confirmed that new lighting will be limited to downlights under an entry canopy and on a sign. Parking: Were changes to the parking from the original plan. No new traffic patterns or curb cuts. Drainage: Need engineer report. Town engineer gave a verbal ok to the plan. Need a SWPPP. Signage: Will be a lite cross on the front of the building. Need lighting details Landscaping: Need a definite location and screening/enclosure plan for the dumpster. The only landscaping will be grass.