Text · page 1 of 3
Read the whole document on one page (all 3 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
TOWN OF ELMA PLANNING BOARD 1600 Bowen Road, Elma, New York 14059 Phone: 716-652-3260 MINUTES OF REGULAR MEETING ~May 19, 2026 The Regular Meeting of the Town of Elma Planning Board, hereinafier referred to as the EPB, was held on Tuesday, May 19, 2026, at 7:03 PM in the Elma Town Hall at 1600 Bowen Road, Elma, New York. PRESENT: TOWN REPRESENTATIVES PRESENT Member Michael Cleary Phyllis Todoro - Town Attorney Member Gregory Merkle James Wyzykiewicz — Town Engineer Member James Millard Member Charles Putzbach ABSENT: Member Robert Waver Chairman Michael Cirocco Alternate James Lembke Raymond Balcerzak - Asst Building Inspector L Approval of Regular Meeting Minutes from April 19, 2026 Mr. Merkle motioned to approve the Minutes of the EPB Regular Meeting held on April 19, 2026. Mr. Cleary 2nd motion. Motion approved. I. Site plan review for a 60’ x 115’ storage building for Cellino Plumbing @ 611 Bullis Rd Applicant : Lucas Cellino No applicant present III. Siteplan review for a 50’ x 80’ addition for Transit Auto Detail @ 2161 Transit Rd Applicant Al Hassan The applicant, Al Hassan, plans a used car sales, towing, auto repair, and collision service business at 2161 Transit Road. Two existing buildings will remain, and an old roofless garage on-site will be eliminated. A new 50’ x 80’ building will be added. Applicant is in the process of purchasing the property and provided an updated letter of intent to purchase. The high ceiling existing garage will be used to service tow trucks. The other building will include 2 bays for a repair shop, 2 for collision shop and 1 for storage. The exterior colors will likely be gray, beige, or black. Under C-3: automotive service/public garage uses require Planning Board approval after public hearing (Code 144-86 A(8)(a)). Business Use Permit application submitted; public hearing expected at Town Board. No gasoline pumps proposed; no volatile materials storage; no propane; no marine/RV The checklist: Documentation: Has applied to the town for a “Special Use Permit.” Zoning: C-3 with automotive overlay, need to verify if entire parcel is C-3 orjust the first 300 feet