Southtowns Record

May 19, 2026 Minutes

Government
Town of Elma
Board
Planning Board
Meeting
May 19, 2026
Kind
Minutes
Topics
Zoning and land use, Public safety, Water, sewer and drainage

Original document

Same meeting

Motions and votes

Copied word for word from these minutes. Who moved and seconded, the tally and the roll call appear only where the minutes state them. Picked out automatically: the minutes themselves are the record. All votes for this government.

  1. Mr. Millard made a motion to give preliminary site plan approval; the motion was seconded by Mr. Waver. Yes-6 No-0 Motion Carried

    Carried · Moved by Mr. Millard, seconded by Mr. Waver

    Page 3 of the minutes, motion 2

1 routine motion (minutes, bills, agenda, adjournment…)
  1. Mr. Merkle motioned to approve the Minutes of the EPB Regular Meeting held on April 19, 2026. Mr. Cleary 2nd motion. Motion approved.

    Carried · Moved by Mr. Merkle

    Page 1 of the minutes, motion 1

Text · page 3 of 3

Read the whole document on one page (all 3 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

Town of Elma Planning Board Minutes (5/19/2026)
  Page 3

IV.  Site plan review for an addition and pavilion to Crossroads Christian Church @ 1050
  Girdle Rd  Applicant Pat Kleitz (Continued)

  Water Service & Septic System: The septic system design is being managed by Metzger Engineering,
  who will explore expanding the existing system as suggested by the county. Need approval letters from
  Erie County Health Department and the Elma Water Department.
  Fire Department: Need approval letter from the fire department. Need hydrant shown on plan.

  The applicant expressed an urgent desire to begin construction on the new pavilion before the summer to
  replace an existing tent. The board explained that there was too much outstanding information to give
  final site plan approval of the comprehensive site plan.
  They inquired if the pavilion could be approved and permitted separately from the larger project. The
  board explained that because the pavilion was submitted as part of the comprehensive site plan, it cannot
  be approved independently without a new, standalone application. A building permit cannot be issued
  without final site plan approval for the entire project.
  Applicant was advised to submit all the items needed before the deadline and get on the agenda for the
  next meeting in June. The applicant acknowledged the list and will provide the missing information for
  the next meeting.

  Mr. Millard made a motion to give preliminary site plan approval; the motion was seconded by Mr. Waver.
  Yes-6 No-0 Motion Carried

Vz  Other Business
  Mr. Bob Gross expressed frustration about not being on the agenda. He stated he followed the correct
  procedure by submitting paperwork to the building inspector and was put on the agenda, only to be
  removed by the chairman, Mike. He feels he is being discriminated against and was denied his right to be
  heard. The board responded that the chairman reviewed his submission, felt it contained no new
  information, and therefore he was not on the final agenda. The exchange became heated, with Mr. Gross
  mentioning legal action.

  Adjourn

  Motion to adjourn at 8:17 PM by unanimous consent.

  Respectfully submitted,

  Barbara Blair
  Elma Planning Board Secretary