Text · page 3 of 3
Read the whole document on one page (all 3 pages, each with its own heading)
This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.
Town of Elma Planning Board Minutes (5/19/2026) Page 3 IV. Site plan review for an addition and pavilion to Crossroads Christian Church @ 1050 Girdle Rd Applicant Pat Kleitz (Continued) Water Service & Septic System: The septic system design is being managed by Metzger Engineering, who will explore expanding the existing system as suggested by the county. Need approval letters from Erie County Health Department and the Elma Water Department. Fire Department: Need approval letter from the fire department. Need hydrant shown on plan. The applicant expressed an urgent desire to begin construction on the new pavilion before the summer to replace an existing tent. The board explained that there was too much outstanding information to give final site plan approval of the comprehensive site plan. They inquired if the pavilion could be approved and permitted separately from the larger project. The board explained that because the pavilion was submitted as part of the comprehensive site plan, it cannot be approved independently without a new, standalone application. A building permit cannot be issued without final site plan approval for the entire project. Applicant was advised to submit all the items needed before the deadline and get on the agenda for the next meeting in June. The applicant acknowledged the list and will provide the missing information for the next meeting. Mr. Millard made a motion to give preliminary site plan approval; the motion was seconded by Mr. Waver. Yes-6 No-0 Motion Carried Vz Other Business Mr. Bob Gross expressed frustration about not being on the agenda. He stated he followed the correct procedure by submitting paperwork to the building inspector and was put on the agenda, only to be removed by the chairman, Mike. He feels he is being discriminated against and was denied his right to be heard. The board responded that the chairman reviewed his submission, felt it contained no new information, and therefore he was not on the final agenda. The exchange became heated, with Mr. Gross mentioning legal action. Adjourn Motion to adjourn at 8:17 PM by unanimous consent. Respectfully submitted, Barbara Blair Elma Planning Board Secretary