Southtowns Record

June 16, 2026 Minutes

Government
Town of Elma
Board
Planning Board
Meeting
Jun 16, 2026
Kind
Minutes
Topics
Zoning and land use, Water, sewer and drainage, Public safety

Original document

Same meeting

Motions and votes

Copied word for word from these minutes. Who moved and seconded, the tally and the roll call appear only where the minutes state them. Picked out automatically: the minutes themselves are the record. All votes for this government.

  1. The EPB reviewed the short form SEQR. Michael Cirocco made a motion to check box #2 on the SEQR; the motion was seconded by Robert Waver. Yes-4 No-0 Motion Carried

    Carried · Moved by R. Michael Cirocco, seconded by Robert Waver

    Page 1 of the minutes, motion 2

  2. A motion was made by James Millard and Seconded by James Lembke to give final site plan approval contingent on approval from the fire department. Yes-4 No-0 Motion Carried

    Carried · Moved by James Millard, seconded by James Lembke

    Page 1 of the minutes, motion 3

  3. A motion was made by Michael Cirocco and Seconded by James Lembke to give preliminary site plan approval Yes-4 No-0 Motion Carried

    Carried · Moved by Michael Cirocco, seconded by James Lembke

    Page 2 of the minutes, motion 4

  4. The EPB reviewed the short form SEQR. Michael Cirocco made a motion to check box #2 on the SEQR; the motion was seconded by Robert Waver. Yes-4 No-0 Motion Carried

    Carried · Moved by R. Michael Cirocco, seconded by Robert Waver

    Page 2 of the minutes, motion 5

  5. A motion was made by James Millard and Seconded by James Lembke to give final site plan approval contingent on approval of Special Use Permit by the Elma Town Board. Yes-4 No-0 Motion Carried

    Carried · Moved by James Millard, seconded by James Lembke

    Page 2 of the minutes, motion 6

  6. The EPB reviewed the short form SEQR. Michael Cirocco made a motion to check box #2 on the SEOR; the motion was seconded by Robert Waver. Yes-4 No-0 Motion Carried

    Carried · Moved by R. Michael Cirocco, seconded by Robert Waver

    Page 3 of the minutes, motion 7

  7. A motion was made by Robert Waver and Seconded by James Lembke to give final site plan approval contingent on approval from fire department and Erie County Health Department. Yes-4 No-0 Motion Carried

    Carried · Moved by Robert Waver, seconded by James Lembke

    Page 3 of the minutes, motion 8

1 routine motion (minutes, bills, agenda, adjournment…)
  1. Mr. Millard motioned to approve the Minutes of the EPB Regular Meeting held on May 19, 2026. Mr. Lembke 2nd motion. Motion approved.

    Carried · Moved by Mr. Millard

    Page 1 of the minutes, motion 1

Text · page 1 of 3

Read the whole document on one page (all 3 pages, each with its own heading)

This document was a scan. Its text was produced by character recognition and may contain errors; check the original for exact wording.

TOWN OF ELMA PLANNING BOARD
  1600 Bowen Road, Elma, New York 14059
  Phone: 716-652-3260

  MINUTES OF REGULAR MEETING ~June 16, 2026
  The Regular Meeting of the Town of Elma Planning Board, hereinafter referred to as the EPB, was held
  on Tuesday, June 16, 2026, at 7:04 PM in the Elma Town Hall at 1600 Bowen Road, Elma, New York.

  PRESENT:  ABSENT:
  Chairman Michael Cirocco  Member Michael Cleary
  Member James Millard  Member Gregory Merkle
  Member Robert Waver  Member Charles Putzbach
  Alternate James Lembke  Raymond Balcerzak - Asst Building Inspector

  TOWN.  REPRESENTATIVES
  PRESENT
  Phyllis Todoro - Town Attorney
  James Wyzykiewicz — Town Engineer

I.  Approval of Regular Meeting Minutes from May 19, 2026
  Mr. Millard motioned to approve the Minutes of the EPB Regular Meeting held on May 19, 2026. Mr.
  Lembke 2nd motion. Motion approved.

I.  Site plan review for a 60’ x 115’ storage building for Cellino Plumbing @ 611 Bullis Rd
  Applicant : Lucas Cellino

  Mike Berger from Sutton Architecture, representing Cellino Plumbing, spoke about plans for a 6,900 sq.
  ft. pole barn at the rear of the lot behind existing building. Building will be used for material storage,
  loading/unloading trucks. The existing building will remain as an office. The adjacent house on same
  property will be removed, and a new parking area will be created. Revisions from prior submission
  included correcting address to 611 Bullis Road and removing property merger on plans, there were no
  substantial changes. The EPB reviewed the checklist: Setbacks appear compliant; lighting addressed;
  informational wetlands currently tied up in court—building department confirmed none on site; septic
  location shown (front of two-story building); landscaping added (front of building and around septic); no
  new water service; no dumpsters proposed.

  The EPB reviewed the short form SEQR. Michael Cirocco made a motion to check box #2 on the SEQR;
  the motion was seconded by Robert Waver.  Yes-4 No-0 Motion Carried

  A motion was made by James Millard and Seconded by James Lembke to give final site plan approval
  contingent on approval from the fire department. Yes-4 No-0 Motion Carried